Skip to content
Skillpedia
General coding8.2k · #12548

chained-pr

What it does

This skill helps your AI break a large code change into a series of smaller pull requests. It is for developers whose change is too big for a reviewer to read in one sitting.

When to use it

  • ✓When a planned pull request is likely to exceed about 400 changed lines.
  • ✓When you want stacked pull requests or review slices to keep reviews focused.
  • ✓When a feature must be merged in parts and needs a tracking pull request.

Skill link

https://github.com/Gentleman-Programming/gentle-ai/blob/main/internal/assets/skills/chained-pr/SKILL.md

Copy it and paste it into your AI (Claude, ChatGPT or Cursor), asking it to follow the instructions.

How to use

The easiest way: copy the message and paste it into your AI. It reads the skill and follows the instructions.

Ready-to-paste message

Use this skill to help me: https://github.com/Gentleman-Programming/gentle-ai/blob/main/internal/assets/skills/chained-pr/SKILL.md Read the SKILL.md file at that link and follow its instructions for my task.
Want your AI to find skills like this on its own?Install the free Skillpedia MCP: one line, and it searches 15,000+ skills before each task.Install in 1 minute →

Example of what to ask your AI

“My change is 900 lines. Split it into chained pull requests that reviewers can handle one at a time.”

5 new skills a week. 1 minute to read.

How it works

The skill slices the work into logical units, keeps tests and docs with the code they check, and sets each pull request to build on the one before it. It explains the dependencies in each one.

Technical content (original SKILL.md)

Original text by the author, straight from GitHub.

Activation Contract

Load this skill when a planned PR may exceed 400 changed lines, an ODD feature's forecast or running authored changed-line count from work-unit commits exceeds about 400, or the user asks for chained/stacked PRs, review slices, or reviewer-load control.

Hard Rules

  • Split PRs over 400 changed lines unless a maintainer explicitly accepts size:exception.
  • The budget constrains how work is sliced, never the code itself. Never delete comments, blank lines, docs, or tests, and never compress or restyle code, to fit under the budget.
  • Slicing is bounded: make one honest slicing pass. If no cohesive split brings every slice within budget, stop iterating, keep the best cohesive split, and report the final line count with a size:exception recommendation.
  • Keep each PR reviewable in about ≤60 minutes.
  • Use one deliverable work unit per PR; keep tests/docs with the unit they verify.
  • State start, end, prior dependencies, follow-up work, and out-of-scope items in every chained PR.
  • Every child PR must include a dependency diagram marking the current PR with 📍.
  • In Feature Branch Chain, create a draft/no-merge tracker PR; child PR #1 targets the tracker branch, later children target the immediate parent branch.
  • Treat polluted diffs as base bugs: retarget or rebase until only the current work unit appears.
  • Do not mix chain strategies after the user chooses one.

Decision Gates

Condition Action
PR ≤400 changed lines and focused Keep single PR.
PR >400, each slice can land independently Use Stacked PRs to main.
PR >400, feature must integrate before main Use Feature Branch Chain with tracker.
Generated/vendor/migration diff cannot split cleanly Ask maintainer for size:exception.
No cohesive split fits the budget after one slicing pass Stop; deliver the best split, report the overage and why it cannot shrink further, and recommend size:exception.
ODD provides delivery_strategy and chain_strategy Follow them before the next work-unit commit or PR creation.

Execution Steps

  1. Estimate changed lines and identify independent work units.
  2. Ask for a chain strategy when none is cached and the budget is exceeded.
  3. Create branches/PRs using the chosen strategy only.
  4. Add Chain Context to each PR without replacing the repo PR template.
  5. Verify each PR independently: CI/tests/docs/manual checks, rollback scope, and clean diff.
  6. Keep tracker PR draft/no-merge until all child PRs are reviewed and integrated.

Output Contract

Return the chosen strategy, PR order, current PR boundary, dependency diagram, review budget (additions + deletions), verification plan, and any size:exception rationale.

References

FAQ

Does it shorten the code to fit the limit?

No. The skill says the size limit shapes how work is sliced, never how the code is written.

What is the time goal for each pull request?

The skill aims for each review to take about 60 minutes or less.

What is a Feature Branch Chain?

It is a strategy where a draft tracker pull request holds the feature branch, and child pull requests build on it.

Details

Original description by the author

Trigger: PRs over 400 lines, stacked PRs, review slices. Split oversized changes into chained PRs that protect review focus.

repo: Gentleman-Programming/gentle-ai

Popularity

GitHub stars
8.2k
Ranking position
#12548
License
MIT
Updated
11/1/2026

Is this skill useful?

0

Sign in to vote.

Comments

  • …

More skills from this repository

Similar skills