Skip to content
Skillpedia
Misc81k · #1607

cost-projection

What it does

This skill predicts future AI spending from your recent daily rate. It is for people planning a budget who want to know when they might run out.

When to use it

  • ✓When you want to know what your AI spending might be next month or next year.
  • ✓When you are planning how long a budget will last.
  • ✓When you want a warning before a budget is used up.

Skill link

https://github.com/ruvnet/ruflo/blob/main/plugins/ruflo-cost-tracker/skills/cost-projection/SKILL.md

Copy it and paste it into your AI (Claude, ChatGPT or Cursor), asking it to follow the instructions.

How to use

The easiest way: copy the message and paste it into your AI. It reads the skill and follows the instructions.

Ready-to-paste message

Use this skill to help me: https://github.com/ruvnet/ruflo/blob/main/plugins/ruflo-cost-tracker/skills/cost-projection/SKILL.md Read the SKILL.md file at that link and follow its instructions for my task.
Want your AI to find skills like this on its own?Install the free Skillpedia MCP: one line, and it searches 15,000+ skills before each task.Install in 1 minute →

Example of what to ask your AI

“At my current pace, when will I run out of my AI budget?”

5 new skills a week. 1 minute to read.

How it works

The skill works out your average daily spend over a recent window and extends it in a straight line to each time frame. If a budget is set, it also shows how many days until each share of it is used.

Technical content (original SKILL.md)

Original text by the author, straight from GitHub.

Forward-looking cost projection that pairs with cost-budget-check:

  • cost-budget-check answers "have we crossed the line?" — reactive
  • cost-projection answers "when will we cross the line?" — predictive

Algorithm

  1. Read all session-* records from the cost-tracking namespace (same source cost-budget-check uses).
  2. Filter to a measurement window (default last 7 days on capturedAt/startedAt).
  3. Compute the per-day burn rate: windowSpend / windowDays.
  4. Linear-extrapolate to each requested horizon (default 7d/30d/90d/365d).
  5. If a budget is configured (budget-config key set by cost-budget set):
    • Compute "days until 75% / 90% / 100% consumed" at the current rate.
    • Surface as a separate table block with ALREADY REACHED markers for thresholds already exceeded.

Flags

--window <duration> Measurement window. Nh|Nd|Nw|Nm. Default 7d. --horizons <csv> Projection horizons. Default 7d,30d,90d,365d. --format table|json Default table (markdown).

Env: PROJECTION_NAMESPACE override (default cost-tracking), PROJECTION_QUIET=1 (alias for --format json).

Smoke transcript (3 sessions × $1 over 7d, $20 budget)

| Sessions in window | 3 |
| Window spend | $3.000000 |
| **USD per day** | **$0.428571** |
| All-time spend | $3.000000 across 3 sessions |

## Projected spend (linear extrapolation)
| Horizon | Days | Projected spend |
|---|---:|---:|
| 7d | 7 | $3.0000 |
| 30d | 30 | $12.8571 |

## Budget exhaustion ($20.00 configured)
| Threshold | Target | Remaining | Time at current rate |
|---|---:|---:|---|
| 75% | $15.00 | $12.00 | 28.0 days |
| 90% | $18.00 | $15.00 | 35.0 days |
| 100% | $20.00 | $17.00 | 39.7 days |

When to use

  • Finance / SRE planning: hand the JSON output to a budget dashboard for "are we on track for the quarter?".
  • CI gates: cost-projection --format json | jq '.budget.exhaustion[2].daysUntilReached < 7' → fail builds when 100% exhaustion is < 1 week away.
  • Post-workload-shift sanity check: after a big feature lands, re-run to verify the rate hasn't accelerated past expectations.

Stationarity assumption

Linear extrapolation assumes the current rate holds. The footer reminds operators to re-run after workload shifts. For drift detection over MULTIPLE windows, pair with cost-trend (which already covers benchmark-drift).

FAQ

Is the forecast exact?

No. It is a simple straight-line estimate from recent use, so changes in usage will change the result.

Which time periods can it show?

By default 7, 30, 90 and 365 days, and you can choose other periods.

What does already reached mean?

It marks a budget threshold that the current data has already passed.

Details

Original description by the author

Forward-looking spend extrapolation. Computes a USD-per-day rate from the recent measurement window, projects to 7d/30d/90d/365d horizons, and surfaces "days until budget exhausted" when a budget is configured. Predictive counterpart to `cost-budget-check` (reactive).

repo: ruvnet/ruflo

Popularity

GitHub stars
81k
Ranking position
#1607
License
MIT
Updated
11/2/2026

Is this skill useful?

0

Sign in to vote.

Comments

  • …

More skills from this repository

Similar skills