cost-projection
What it does
This skill predicts future AI spending from your recent daily rate. It is for people planning a budget who want to know when they might run out.
When to use it
- ✓When you want to know what your AI spending might be next month or next year.
- ✓When you are planning how long a budget will last.
- ✓When you want a warning before a budget is used up.
Skill link
https://github.com/ruvnet/ruflo/blob/main/plugins/ruflo-cost-tracker/skills/cost-projection/SKILL.mdCopy it and paste it into your AI (Claude, ChatGPT or Cursor), asking it to follow the instructions.
How to use
The easiest way: copy the message and paste it into your AI. It reads the skill and follows the instructions.
Ready-to-paste message
For Claude Code, Codex or Cursor: run it in your project folder and the skill gets installed.
Download the SKILL.md and drop it into your agent’s skills folder.
Example of what to ask your AI
“At my current pace, when will I run out of my AI budget?”
5 new skills a week. 1 minute to read.
How it works
The skill works out your average daily spend over a recent window and extends it in a straight line to each time frame. If a budget is set, it also shows how many days until each share of it is used.
Technical content (original SKILL.md)
Original text by the author, straight from GitHub.
Forward-looking cost projection that pairs with cost-budget-check:
cost-budget-checkanswers "have we crossed the line?" — reactivecost-projectionanswers "when will we cross the line?" — predictive
Algorithm
- Read all
session-*records from thecost-trackingnamespace (same sourcecost-budget-checkuses). - Filter to a measurement window (default last 7 days on
capturedAt/startedAt). - Compute the per-day burn rate:
windowSpend / windowDays. - Linear-extrapolate to each requested horizon (default 7d/30d/90d/365d).
- If a budget is configured (
budget-configkey set bycost-budget set):- Compute "days until 75% / 90% / 100% consumed" at the current rate.
- Surface as a separate table block with
ALREADY REACHEDmarkers for thresholds already exceeded.
Flags
--window <duration> Measurement window. Nh|Nd|Nw|Nm. Default 7d.
--horizons <csv> Projection horizons. Default 7d,30d,90d,365d.
--format table|json Default table (markdown).
Env: PROJECTION_NAMESPACE override (default cost-tracking), PROJECTION_QUIET=1 (alias for --format json).
Smoke transcript (3 sessions × $1 over 7d, $20 budget)
| Sessions in window | 3 |
| Window spend | $3.000000 |
| **USD per day** | **$0.428571** |
| All-time spend | $3.000000 across 3 sessions |
## Projected spend (linear extrapolation)
| Horizon | Days | Projected spend |
|---|---:|---:|
| 7d | 7 | $3.0000 |
| 30d | 30 | $12.8571 |
## Budget exhaustion ($20.00 configured)
| Threshold | Target | Remaining | Time at current rate |
|---|---:|---:|---|
| 75% | $15.00 | $12.00 | 28.0 days |
| 90% | $18.00 | $15.00 | 35.0 days |
| 100% | $20.00 | $17.00 | 39.7 days |
When to use
- Finance / SRE planning: hand the JSON output to a budget dashboard for "are we on track for the quarter?".
- CI gates:
cost-projection --format json | jq '.budget.exhaustion[2].daysUntilReached < 7'→ fail builds when 100% exhaustion is < 1 week away. - Post-workload-shift sanity check: after a big feature lands, re-run to verify the rate hasn't accelerated past expectations.
Stationarity assumption
Linear extrapolation assumes the current rate holds. The footer reminds operators to re-run after workload shifts. For drift detection over MULTIPLE windows, pair with cost-trend (which already covers benchmark-drift).
FAQ
Is the forecast exact?
No. It is a simple straight-line estimate from recent use, so changes in usage will change the result.
Which time periods can it show?
By default 7, 30, 90 and 365 days, and you can choose other periods.
What does already reached mean?
It marks a budget threshold that the current data has already passed.
Details
Original description by the author
Forward-looking spend extrapolation. Computes a USD-per-day rate from the recent measurement window, projects to 7d/30d/90d/365d horizons, and surfaces "days until budget exhausted" when a budget is configured. Predictive counterpart to `cost-budget-check` (reactive).
repo: ruvnet/ruflo
Popularity
- GitHub stars
- 81k
- Ranking position
- #1607
- License
- MIT
- Updated
- 11/2/2026
Comments
- …
More skills from this repository
agent-adaptive-coordinator
81kHelps your agent split and rebalance a group of AI agents as the workload changes, choosing a layout that fits the task.
agent-agent
81kTeaches your agent to turn a big goal into an ordered plan of actions, and to replan when conditions change.
agent-agentic-payments
81kHelps your agent manage spending mandates for AI shopping, with spend caps, time windows, merchant rules and signed approvals.
agent-analyze-code-quality
81kHelps your agent review code for quality, finding code smells, technical debt and refactoring ideas without changing the files.
Similar skills
blucli
394kHelps your agent find, play, pause, group, and adjust the volume of Bluesound and NAD speakers through the blu command.
camsnap
394kHelps your agent grab snapshots, short clips, or motion events from network cameras and local webcams that you have set up.
eightctl
394kHelps your agent check and control an Eight Sleep pod, including its temperature, alarms, and sleep schedules.