day-one-patch

What it does

This skill plans a short patch for known problems found after a game's final build is locked. It is for game teams preparing for launch day who need a safe, limited fix.

When to use it

  • βœ“When the final build of a game is locked and a few known bugs are too risky to fix in that build.
  • βœ“When certification feedback asks for small fixes after a game was submitted.
  • βœ“When a playtest before launch finds serious problems after the release check has passed.

Skill link

https://github.com/Donchitos/Claude-Code-Game-Studios/blob/main/.claude/skills/day-one-patch/SKILL.md

Copy it and paste it into your AI (Claude, ChatGPT or Cursor), asking it to follow the instructions.

How to use

The easiest way: copy the message and paste it into your AI. It reads the skill and follows the instructions.

Ready-to-paste message

Use this skill to help me: https://github.com/Donchitos/Claude-Code-Game-Studios/blob/main/.claude/skills/day-one-patch/SKILL.md Read the SKILL.md file at that link and follow its instructions for my task.
Want your AI to find skills like this on its own?Install the free Skillpedia MCP: one line, and it searches 15,000+ skills before each task.Install in 1 minute β†’

Example of what to ask your AI

β€œHelp me plan a day-one patch that fixes only the safe, serious bugs from our launch build.”

5 new skills a week. 1 minute to read.

How it works

The skill reads the release status, open bug reports and recent sprint work, then limits the patch to small, low-risk fixes. It also checks for a QA pass and a rollback plan before anything ships.

Technical content (original SKILL.md)

Original text by the author, straight from GitHub.

Day-One Patch

Every shipped game has a day-one patch. Planning it before launch day prevents chaos. This skill scopes the patch to only what is safe and necessary, gates it through a lightweight QA pass, and ensures a rollback plan exists before anything ships. It is a mini-sprint β€” not a hotfix, not a full sprint.

When to run:

  • After the gold master build is locked (cert approved or launch candidate tagged)
  • When known bugs exist that are too risky to address in the gold master
  • When cert feedback requires minor fixes post-submission
  • When a pre-launch playtest surfaces must-fix issues after the release gate passed

Day-one patch scope rules:

  • Only P1/P2 bugs that are SAFE to fix quickly
  • No new features β€” this is fix-only
  • No refactoring β€” minimum viable change
  • Any fix that requires more than 4 hours of dev time belongs in patch 1.1, not day-one

Output: production/releases/day-one-patch-[version].md


Phase 1: Load Release Context

Read:

  • project.stage in project.yaml (fallback production/stage.txt) β€” confirm project is in Release stage
  • The most recent file in production/gate-checks/ β€” read the release gate verdict
  • production/qa/bugs/*.md β€” load all bugs with Status: Open or Fixed β€” Pending Verification
  • production/sprints/ most recent β€” understand what shipped
  • production/security/security-audit-*.md most recent β€” check for any open security items

If the resolved stage (project.yaml β†’ stage.txt) is not Release or Polish:

"Day-one patch prep is for Release-stage projects. Current stage: [stage]. This skill is not appropriate until you are approaching launch."

Check the premise, do not assume it. This whole skill rests on there being a gold master that already passed a release gate β€” that premise is what justifies its lightweight QA pass instead of a full one. So verify it rather than inferring it from the stage value:

  • No file in production/gate-checks/, or none recording a release-gate verdict: report Release gate: NOT ASSESSED β€” no gate-check record found. Do not proceed silently. Say plainly that the reduced QA scope below is justified by a gate nobody can find, and ask whether to run /gate-check first or proceed with a full QA pass instead.
  • The most recent record is FAIL, CONCERNS or NOT ASSESSED: name it and stop. A day-one patch on top of a build that never passed its gate is not a day-one patch; it is the release gate, arriving late and scoped to the wrong changes.
  • project.stage: Release on its own does not establish this. The stage is a claim about where the project is; the gate record is the evidence that it earned the position.

Phase 2: Scope the Patch

Step 2a β€” Classify open bugs for patch inclusion

For each open bug, evaluate:

Criterion Include in day-one?
S1 or S2 severity Yes β€” must include if safe to fix
P1 priority Yes
Fix estimated < 4 hours Yes
Fix requires architecture change No β€” defer to 1.1
Fix introduces new code paths No β€” too risky
Fix is data/config only (no code change) Yes β€” very low risk
Cert feedback requirement Yes β€” required for platform approval
S3/S4 severity Only if trivial config fix; otherwise defer

Step 2b β€” Present patch scope to user

Use AskUserQuestion:

  • Prompt: "Based on open bugs and cert feedback, here is the proposed day-one patch scope. Does this look right?"
  • Show: table of included bugs (ID, severity, description, estimated effort)
  • Show: table of deferred bugs (ID, severity, reason deferred)
  • Options: [A] Approve this scope / [B] Adjust β€” I want to add or remove items / [C] No day-one patch needed

If [C]: output "No day-one patch required. Proceed to /launch-checklist." Stop.

Step 2c β€” Check total scope

Sum estimated effort. If total exceeds 1 day of work:

"⚠️ Patch scope is [N hours] β€” this exceeds a safe day-one window. Consider deferring lower-priority items to patch 1.1. A bloated day-one patch introduces more risk than it removes."

Use AskUserQuestion to confirm proceeding or reduce scope.


Phase 3: Rollback Plan

Before any code is written, define the rollback procedure. This is non-negotiable.

Spawn release-manager via Agent. Ask them to produce a rollback plan covering:

  • How to revert to the gold master build on each target platform
  • Platform-specific rollback constraints (some platforms cannot roll bac
FAQ

What kinds of fixes does it allow?

It allows only high-priority bugs that can be fixed quickly, and new features and large refactors are excluded.

What is a rollback plan?

It is a written way to undo the patch if it causes new problems after release.

Where is the plan saved?

It is saved as a release file in the project's production releases folder.

Details

Original description by the author

Day-one launch patch β€” focused fix for known issues found after gold master. Mini-sprint with QA gate and rollback.

repo: Donchitos/Claude-Code-Game-Studios

Popularity

GitHub stars
33k
Ranking position
#8452
License
MIT
Updated
10/18/2026