eol-checklist
What it does
This skill turns a decision to retire a product into an operational checklist organized by lifecycle phase. It is for product managers who need to plan the practical steps of a sunset.
When to use it
- βWhen you have decided to retire a product and need the operational plan.
- βWhen a sunset affects many customers, contracts, or hardware and needs a structured plan.
- βWhen you are retiring a small internal tool and want a lighter checklist.
Skill link
https://github.com/deanpeters/Product-Manager-Skills/blob/main/skills/eol-checklist/SKILL.mdCopy it and paste it into your AI (Claude, ChatGPT or Cursor), asking it to follow the instructions.
How to use
The easiest way: copy the message and paste it into your AI. It reads the skill and follows the instructions.
Ready-to-paste message
For Claude Code, Codex or Cursor: run it in your project folder and the skill gets installed.
Download the SKILL.md and drop it into your agentβs skills folder.
Example of what to ask your AI
βMake an end-of-life checklist for our legacy internal reporting tool.β
5 new skills a week. 1 minute to read.
How it works
It asks about the product, its scale, any replacement, and hard deadlines. It then builds a checklist whose size fits the sunset, labeling any unknowns as assumptions.
Technical content (original SKILL.md)
Original text by the author, straight from GitHub.
EOL Checklist
Purpose
Turn a sunset decision into a phase-gated operational plan: what must happen, in which lifecycle phase, and who owns it. The output is a working checklist β sticky-note-sized items, each with a verb and a named function β not a strategy document.
The checklist is sized to the sunset. A deprecated internal tool gets a dozen items across three phases. A regulated hardware line gets a cross-functional playbook across six phases with gate criteria between them. Both are correct; using the wrong one is the failure.
Input
Works best with: The product being sunset and any dates you're already committed to.
Also useful: Customer and revenue scale, whether a replacement exists and how ready it is, contract or regulatory obligations, and whether hardware, inventory, or channel partners are in play.
Anything supplied with the invocation itself β text after the skill name, a pasted context dump, or
an appended ARGUMENTS: line β counts as answers already given. Use it and skip whatever it
covers; don't re-ask.
Arriving empty-handed? That works too. The skill asks up to three questions β what's being sunset and at what scale, whether there's a replacement, and what hard deadlines exist β then picks a level and builds. Unknowns become labeled assumptions rather than blockers.
Example invocations:
EOL checklist for our legacy reporting module, shutting down Dec 31, ~400 accounts.Build the heavy checklist for a hardware retirement β service contracts, 8 resellers, UL certified.
Key Concepts
Right-Size Before You Build
Not all EOLs play out the same. Most land in the middle. Pick the level deliberately:
| Level 1 β Light | Level 2 β Standard | Level 3 β Heavy | |
|---|---|---|---|
| Typical scope | Feature, internal tool, unversioned API | Commercial product, active customers | Revenue-critical, hardware, regulated |
| Phases used | 2-3 (NSC, EOS, EOL) | 4-5 (NSC, EOS, EOE, EOM, EOL) | All 6 (NSC through EOSRV) |
| Functional areas | 4 | 11 | 15 |
| Gate criteria | Not needed | Between major phases | Between every phase, with approvers |
| Output feel | Punch list | Working checklist with owners and dates | Cross-functional playbook |
Level 2 is the default. Recommend a level, say why in one line, and let the user move it. If they go lighter, name the specific area that drops out so the choice is informed. Never default to Level 3 β a heavy checklist applied to a light sunset teaches teams that EOL process is ceremony, and they'll skip it next time when it matters.
The level is yours to change mid-build. "Actually make this heavier" is a normal thing to hear after the Legal row surfaces something.
The Lifecycle Gates
- GA (General Availability): Actively sold and fully supported
- NSC (Notice of Status Change): The decision is communicated; planning begins
- EOS (End of Sale): No new customers can purchase
- EOE (End of Expansion): Existing customers cannot add capacity or seats
- EOR (End of Renewal): Existing contracts will not be renewed
- EOM (End of Maintenance): Bug fixes and patches stop
- EOL (End of Life): The product is retired
- EOSRV (End of Service): All support and service obligations end
Which of these become checklist phases: GA is a state, not a phase of work β nothing is checklisted there. EOR is contract-driven and only appears when renewals are in play. So working checklists usually span the six actionable phases: NSC, EOS, EOE, EOM, EOL, EOSRV, with EOR inserted when subscription or service contracts run past EOS.
Naming the gates you're not using is as useful as naming the ones you are. A Level 1 checklist should say "EOE and EOSRV don't apply β nothing to expand, nothing to service."
The Fifteen Functional Areas
Filtered by level. The parenthetical marks the lowest level where each appears:
| Area | Level |
|---|---|
| Product and Strategy | 1 |
| Engineering and Technical | 1 |
| Support | 1 |
| Documentation and Training | 1 |
| Legal and Contractual | 2 |
| Financial Planning | 2 |
| Sales | 2 |
| Marketing | 2 |
| Customer Success | 2 |
| IT Systems | 2 |
| Data Management | 2 |
| Inventory and Supply Chain | 3 |
| Channel and Partner Management | 3 |
| Regulatory and Compliance | 3 |
| Internal Organizational Alignment | 3 |
The Sticky-Note Rule
Every item is 4 to 8 words, names a verb, and carries a named owner (a func
FAQ
Does the checklist size change?
Yes. A small internal tool gets a short list, while a regulated product gets a longer multi-team plan.
What if I do not know the answers?
The skill labels unknowns as assumptions instead of stopping, so you can correct them later.
Is it a strategy document?
No. It is a working checklist made of short, specific items.
Details
Original description by the author
Build a phase-gated EOL checklist sized to the sunset, with a named owner on every item. Use when the decision to retire is made and you need the operational plan.
Popularity
- GitHub stars
- 7.8k
- Ranking position
- #12771
- License
- β
- Updated
- 10/15/2026
Comments
- β¦
More skills from this repository
acquisition-channel-advisor
7.8kHelps your agent judge whether a marketing channel is worth scaling, testing, or stopping, using customer acquisition cost, lifetime value, and payback time.
agent-orchestration-advisor
7.8kHelps your agent plan a complex product task as several specialized AI agents working in parallel, with clear hand-offs and monitoring.
ai-shaped-readiness-advisor
7.8kHelps your agent check whether your product team only uses AI to speed up old tasks, or has redesigned its work around AI, and what to build next.
altitude-horizon-framework
7.8kExplains the shift from product manager to director through two ideas, altitude and horizon, and helps you find where your friction comes from.
Similar skills
knowledge-capture
394kTeaches your agent to save decisions, preferences, and key facts to your Knowledge vault as short notes with source attribution.
knowledge-claim-consolidation
394kHelps your agent tidy a Knowledge vault by merging duplicate claims, moving them to the right subject pages, and retiring outdated ones.
knowledge-correct
394kLets your agent fix or withdraw a specific saved Knowledge claim or page at your request, keeping a record of what changed.