Skip to content
Skillpedia
Tasks & projects7.8k Β· #12774

eol-process

What it does

This skill walks a team through retiring a product from start to finish, with decision points between each phase. It is for product leaders who need the whole sunset process, not just one document.

When to use it

  • βœ“When you are considering retiring a product and need to know the full set of steps.
  • βœ“When a sunset is already underway and something has gone wrong that needs fixing.
  • βœ“When you need to know which specific skill to use for each phase of a retirement.

Skill link

https://github.com/deanpeters/Product-Manager-Skills/blob/main/skills/eol-process/SKILL.md

Copy it and paste it into your AI (Claude, ChatGPT or Cursor), asking it to follow the instructions.

How to use

The easiest way: copy the message and paste it into your AI. It reads the skill and follows the instructions.

Ready-to-paste message

Use this skill to help me: https://github.com/deanpeters/Product-Manager-Skills/blob/main/skills/eol-process/SKILL.md Read the SKILL.md file at that link and follow its instructions for my task.
Want your AI to find skills like this on its own?Install the free Skillpedia MCP: one line, and it searches 15,000+ skills before each task.Install in 1 minute β†’

Example of what to ask your AI

β€œWe are thinking about retiring our legacy analytics product. Walk me through the whole end-of-life process.”

5 new skills a week. 1 minute to read.

How it works

It establishes what is being retired and where you are, then moves through six phases: decide, align, plan, prepare, announce, and close. It points you to the right artifact skill for each phase.

Technical content (original SKILL.md)

Original text by the author, straight from GitHub.

EOL Process

Purpose

Run a product retirement end to end: decide whether to do it, align the people who can stop it, build the operational plan, ready the teams who will face customers, announce it, and close it out properly. Six phases with decision points between them.

The governing goal, and the sentence worth keeping in your head the whole way through: lose the product without losing the customer. Most of what follows exists to protect the second half of that sentence.

This is an orchestration skill. It doesn't replace the artifact skills β€” it tells you which one to reach for, when, and what has to be true before you move on.

Input

Works best with: The product being retired and where you currently are β€” considering it, decided, mid-plan, or already announced and struggling.

Also useful: Scale (customers, revenue, contracts), whether a replacement exists, and who already knows.

Anything supplied with the invocation itself β€” text after the skill name, a pasted context dump, or an appended ARGUMENTS: line β€” counts as answers already given. Use it and skip whatever it covers; don't re-ask.

Arriving empty-handed? That works too. The process opens by establishing what's being retired and where you are in it, then routes you to the right phase. If you're mid-sunset and something is going wrong, say so β€” the diagnostic in "Entering Mid-Stream" finds the skipped phase.

Example invocations:

  • Run the full EOL process for our legacy reporting module β€” decision made, nothing else started.
  • We announced a sunset three weeks ago and Support is drowning. What did we skip?

Key Concepts

The Six Phases

# Phase Question it answers Primary artifact
1 Decide Should we retire this, and how big is this? Readiness assessment + intensity level
2 Align Who can stop this, and what do they know that we don't? Stakeholder sequence
3 Plan What has to happen, when, and who owns it? Phase-gated checklist
4 Prepare Are our people ready before our customers hear? Internal enablement pack
5 Announce What do customers hear, and when? Customer EOL message
6 Close Did we finish, and what did we learn? Post-EOL review

Phase 6 is the one everyone skips. It's also the phase that makes your next sunset cheaper. Budget for it up front, because nobody volunteers for it afterward.

This Is a Route, Not a Pipeline

Every skill in this suite stands alone. None requires another to have run first. This process is a recommended route through independent stops, not a conveyor belt β€” which means:

  • You can enter at any phase. Decision already made and defensible? Start at Phase 2.
  • You can skip phases when the level justifies it. A Level 1 sunset often collapses 2 through 4 into a single afternoon.
  • You can go backwards, and sometimes must. Phase 2 routinely sends you back to Phase 1 β€” a Legal finding or a Sales commitment can invalidate the decision. That's the process working, not failing.
  • Nothing hands off a format. Carrying context between phases means telling the next skill "Level 2" and pasting what you have. There's no schema to preserve.

The order earns its keep because each phase surfaces what the next one needs. Deviate deliberately, not accidentally.

Right-Size the Whole Process

Not all EOLs play out the same. The process compresses or expands with the sunset:

Level 1 β€” Light Level 2 β€” Standard Level 3 β€” Heavy
Typical scope Feature, internal tool, API Commercial product, active customers Revenue-critical, hardware, regulated
Elapsed time Days to weeks 6-12 months 12-24 months
Phase 2 stops 3-4 7-8 10+
Phase 3 gates 2-3 phases, no gate criteria 4-5 phases with gates All 6 phases, gates with approvers
Phase 4 output Support FAQ + Sales points, objections, escalation + Channel brief, training
Phase 5 message Brief notice Standard with phase table Full, phased, with compliance
Phases 2-4 Often collapse into one sitting Distinct, sequential Distinct, with their own workstreams

Level 2 is the default. Set the level in Phase 1, and let it size everything downstream. Never default to Level 3 β€” process theater on a small sunset teaches everyone to ignore the process on a big one.

Entering Mid-Stream

Most people find th

FAQ

What is the main goal?

To lose the product without losing the customer. Most steps are meant to protect that relationship.

Can I start in the middle?

Yes. The process includes a diagnostic for teams already partway through a sunset that is going wrong.

Does it write the documents itself?

No. It is an orchestration guide that tells you which artifact skill to use and when.

Details

Original description by the author

Run a product sunset end to end β€” decide, align, plan, prepare, announce, close. Use when you need the whole EOL process, not just one artifact.

repo: deanpeters/Product-Manager-Skills

Popularity

GitHub stars
7.8k
Ranking position
#12774
License
β€”
Updated
10/15/2026

Is this skill useful?

0

Sign in to vote.

Comments

  • …

More skills from this repository

Similar skills