gate-check
What it does
This skill checks whether a game project has the documents and quality it needs to move to the next stage. It is for producers and leads who must decide when to advance.
When to use it
- βWhen a game team asks whether it is ready to move from one development stage to the next.
- βWhen a producer wants a list of missing documents or blockers before a stage change.
- βWhen a lead needs a formal verdict before moving a game into production or release.
Skill link
https://github.com/Donchitos/Claude-Code-Game-Studios/blob/main/.claude/skills/gate-check/SKILL.mdCopy it and paste it into your AI (Claude, ChatGPT or Cursor), asking it to follow the instructions.
How to use
The easiest way: copy the message and paste it into your AI. It reads the skill and follows the instructions.
Ready-to-paste message
For Claude Code, Codex or Cursor: run it in your project folder and the skill gets installed.
Download the SKILL.md and drop it into your agentβs skills folder.
Example of what to ask your AI
βCan we move our game from prototype into production? List anything blocking us.β
5 new skills a week. 1 minute to read.
How it works
The skill reads the project's stage, required artifacts and quality records. It then gives a verdict of pass, concerns, not assessed or fail, along with the blockers and what is required to continue.
Technical content (original SKILL.md)
Original text by the author, straight from GitHub.
!bash "${CLAUDE_SKILL_DIR}/../../hooks/yaml-helper.sh" resolve_config --keys review_mode,workflow,qa.level,testing.strict,performance.enforce,team.size,project.stage,system_overrides
Resolved above β use as-is; --review overrides review_mode. No block β
defaults in .claude/docs/config-resolution.md.
Phase Gate Validation
This skill validates whether the project is ready to advance to the next development phase. It checks for required artifacts, quality standards, and blockers.
Distinct from /project-stage-detect: That skill is diagnostic ("where are we?").
This skill is prescriptive ("are we ready to advance?" with a formal verdict).
Production Stages (7)
The project progresses through these stages:
- Concept β Brainstorming, game concept document
- Systems Design β Mapping systems, writing GDDs
- Technical Setup β Engine config, architecture decisions
- Pre-Production β Prototyping, vertical slice validation
- Production β Feature development (Epic/Feature/Task tracking active)
- Polish β Performance, playtesting, bug fixing
- Release β Launch prep, certification
When a gate passes (or the user explicitly accepts a CONCERNS verdict's risks β Section 6), update the stage in both project.yaml (set project.stage: <new-stage>) AND write the new stage name to production/stage.txt (single line, e.g. Production). Dual-write keeps backward compatibility with hooks that haven't migrated yet. This updates the status line immediately.
1. Parse Arguments
Target phase: $ARGUMENTS with any --review <mode> pair removed (blank = auto-detect current stage, then validate next transition). /gate-check --review full names no phase.
Note: in solo mode, director spawns (CD-PHASE-GATE, TD-PHASE-GATE, PR-PHASE-GATE, AD-PHASE-GATE) are skipped β gate-check becomes artifact-existence checks only. In lean mode, the phase-gate directors still run (phase gates are the purpose of lean mode); how many of them run is set by workflow below.
workflow (per .claude/docs/workflow-modes.md):
gate-check runs project-wide, so it uses the project-level workflow for the
gate's overall artifact checklist (the loaded gate file), AND consults
workflow_overrides.system_overrides.<system> per-system when validating MVP
GDDs β a system pinned to a higher tier must meet that tier's section count
before the gate passes, regardless of the project-level workflow (see Section 2b,
"Per-system overrides").
gate-check honors
workflowbut is exempt fromautomation. The artifact checklist changes per tier; the collaborative prompting protocol (the Collaborative Protocol section) always applies β a phase gate is a deliberate human checkpoint, never auto-run.
qa.level: controls test enforcement at phase gates, where workflow
controls which artifacts are required. modes.rigor sets both together; set
qa.level explicitly to vary enforcement alone. At minimal, no test gates apply β the
test-evidence and unit-test artifact items become non-required and the
Section 3 testing.strict check is a no-op; the smoke check is not relaxed (Section 2b) β
but at this level /smoke-check runs without game tests (its automated row reads
WAIVED), so the build check (commands.smoke, else commands.build, when set) and
the launch and critical-path checks are the floor β a build nobody launched is
NOT ASSESSED β and a project with no tests can still pass. At standard,
Logic + Integration tests must pass. At full, a full coverage check + regression suite are required
(coverage minimum from qa.coverage_minimum if set). The retained screenshots
UI and Visual/Feel stories need are not test items: no qa.level relaxes them
(Section 2b).
team.size: does not change how many directors spawn at a phase gate β panel
width is workflow's axis (Section 4b). This value affects only the
specialist depth within each director's review.
individual uses the core specialist set; small the standard set; studio
adds engine sub-specialists. It never skips a director β skipping directors is
review_mode's job. Both review_mode and team.size are set by
modes.rigor β one rigor choice sets both β and each still overrides that axis
when set explicitly (a full-rigor project gets the studio set; lighter tiers
get individual).
- With argument:
/gate-check productionβ validate readiness for that specific phase - No argument: Aut
FAQ
How is this different from checking where we are?
A stage detection check describes the current state, while this skill gives a formal verdict on whether to advance.
What does a concerns verdict mean?
It means the project may advance, but the listed risks need attention or an explicit acceptance.
Does a passed gate update the stage?
The skill says the stage should be updated in the project files when a gate passes.
Details
Original description by the author
Ready to advance between development phases? PASS/CONCERNS/NOT ASSESSED/FAIL with blockers and required artifacts. 'Can we move to production?'
Popularity
- GitHub stars
- 33k
- Ranking position
- #8457
- License
- MIT
- Updated
- 10/18/2026
Comments
- β¦
More skills from this repository
adopt
33kChecks whether an existing game project's documents follow the studio template's formats, then writes a numbered migration plan to fix any gaps.
architecture-decision
33kWrites an architecture decision record for a technical choice, covering context, alternatives, and consequences, with review by the right technical roles.
architecture-review
33kChecks that your technical decisions cover every design requirement, do not conflict, and fit the engine version, with a clear pass or concern verdict.
art-bible
33kWrites an art bible that defines your game's visual identity, so asset production follows one clear set of style rules.
Similar skills
knowledge-capture
394kTeaches your agent to save decisions, preferences, and key facts to your Knowledge vault as short notes with source attribution.
knowledge-claim-consolidation
394kHelps your agent tidy a Knowledge vault by merging duplicate claims, moving them to the right subject pages, and retiring outdated ones.
knowledge-correct
394kLets your agent fix or withdraw a specific saved Knowledge claim or page at your request, keeping a record of what changed.