Skip to content
Skillpedia
Tasks & projects33k · #8893

notion-spec-to-implementation

What it does

This skill converts a Notion spec into an implementation plan with tasks and progress tracking. It is for product and engineering teams who write specs in Notion and need to build from them.

When to use it

  • ✓When you have a product spec in Notion and want a build plan from it.
  • ✓When you need tasks created in your Notion task database from a spec.
  • ✓When you want the spec, plan and tasks to stay linked as the work progresses.

Skill link

https://github.com/davila7/claude-code-templates/blob/main/cli-tool/components/skills/productivity/notion-spec-to-implementation/SKILL.md

Copy it and paste it into your AI (Claude, ChatGPT or Cursor), asking it to follow the instructions.

How to use

The easiest way: copy the message and paste it into your AI. It reads the skill and follows the instructions.

Ready-to-paste message

Use this skill to help me: https://github.com/davila7/claude-code-templates/blob/main/cli-tool/components/skills/productivity/notion-spec-to-implementation/SKILL.md Read the SKILL.md file at that link and follow its instructions for my task.
Want your AI to find skills like this on its own?Install the free Skillpedia MCP: one line, and it searches 15,000+ skills before each task.Install in 1 minute →

Example of what to ask your AI

“Turn the checkout feature spec in Notion into an implementation plan and add the tasks to our task database.”

5 new skills a week. 1 minute to read.

How it works

The agent finds and reads the spec, notes requirements and open questions, creates a plan page, adds tasks that match your database structure, and links everything together.

Technical content (original SKILL.md)

Original text by the author, straight from GitHub.

Spec to Implementation

Convert a Notion spec into linked implementation plans, tasks, and ongoing status updates.

Quick start

  1. Locate the spec with Notion:notion-search, then fetch it with Notion:notion-fetch.
  2. Parse requirements and ambiguities using reference/spec-parsing.md.
  3. Create a plan page with Notion:notion-create-pages (pick a template: quick vs. full).
  4. Find the task database, confirm schema, then create tasks with Notion:notion-create-pages.
  5. Link spec ↔ plan ↔ tasks; keep status current with Notion:notion-update-page.

Workflow

0) If any MCP call fails because Notion MCP is not connected, pause and set it up:

  1. Add the Notion MCP:
    • codex mcp add notion --url https://mcp.notion.com/mcp
  2. Enable remote MCP client:
    • Set [features].rmcp_client = true in config.toml or run codex --enable rmcp_client
  3. Log in with OAuth:
    • codex mcp login notion

After successful login, the user will have to restart codex. You should finish your answer and tell them so when they try again they can continue with Step 1.

1) Locate and read the spec

  • Search first (Notion:notion-search); if multiple hits, ask the user which to use.
  • Fetch the page (Notion:notion-fetch) and scan for requirements, acceptance criteria, constraints, and priorities. See reference/spec-parsing.md for extraction patterns.
  • Capture gaps/assumptions in a clarifications block before proceeding.

2) Choose plan depth

  • Simple change → use reference/quick-implementation-plan.md.
  • Multi-phase feature/migration → use reference/standard-implementation-plan.md.
  • Create the plan via Notion:notion-create-pages, include: overview, linked spec, requirements summary, phases, dependencies/risks, and success criteria. Link back to the spec.

3) Create tasks

  • Find the task database (Notion:notion-search → Notion:notion-fetch to confirm the data source and required properties). Patterns in reference/task-creation.md.
  • Size tasks to 1–2 days. Use reference/task-creation-template.md for content (context, objective, acceptance criteria, dependencies, resources).
  • Set properties: title/action verb, status, priority, relations to spec + plan, due date/story points/assignee if provided.
  • Create pages with Notion:notion-create-pages using the database's data_source_id.

4) Link artifacts

  • Plan links to spec; tasks link to both plan and spec.
  • Optionally update the spec with a short "Implementation" section pointing to the plan and tasks using Notion:notion-update-page.

5) Track progress

  • Use the cadence in reference/progress-tracking.md.
  • Post updates with reference/progress-update-template.md; close phases with reference/milestone-summary-template.md.
  • Keep checklists and status fields in plan/tasks in sync; note blockers and decisions.

References and examples

  • reference/ — parsing patterns, plan/task templates, progress cadence (e.g., spec-parsing.md, standard-implementation-plan.md, task-creation.md, progress-tracking.md).
  • examples/ — end-to-end walkthroughs (e.g., ui-component.md, api-feature.md, database-migration.md).
FAQ

What if the spec is unclear?

The skill identifies gaps and ambiguities while parsing, so you can resolve them before building.

Can it make a shorter plan?

Yes. It can choose a quick or full plan template.

Does it keep statuses updated?

Yes. It updates the linked pages as the work changes.

Details

Original description by the author

Turn Notion specs into implementation plans, tasks, and progress tracking; use when implementing PRDs/feature specs and creating Notion plans + tasks from them.

repo: davila7/claude-code-templates

Popularity

GitHub stars
33k
Ranking position
#8893
License
MIT
Updated
11/2/2026

Is this skill useful?

0

Sign in to vote.

Comments

  • …

More skills from this repository

Similar skills