Skip to content
Skillpedia
Testing5.1k · #15174

omh-verification-gate

What it does

This skill sets the checks a change must pass before it is called done or merged, such as builds, tests, and CI. It is for developers who want proof rather than assumptions before a merge.

When to use it

  • ✓When a pull request is ready and you want to confirm builds and tests passed before merging.
  • ✓When someone says a change is done and you want the evidence checked.
  • ✓When you need a clear pass, hold, or block decision before a release merge.

Skill link

https://github.com/rlaope/oh-my-hermes/blob/main/agent-skills/omh-verification-gate/SKILL.md

Copy it and paste it into your AI (Claude, ChatGPT or Cursor), asking it to follow the instructions.

How to use

The easiest way: copy the message and paste it into your AI. It reads the skill and follows the instructions.

Ready-to-paste message

Use this skill to help me: https://github.com/rlaope/oh-my-hermes/blob/main/agent-skills/omh-verification-gate/SKILL.md Read the SKILL.md file at that link and follow its instructions for my task.
Want your AI to find skills like this on its own?Install the free Skillpedia MCP: one line, and it searches 15,000+ skills before each task.Install in 1 minute →

Example of what to ask your AI

“Check whether this pull request can be merged by confirming the build, lint, tests, and CI results.”

5 new skills a week. 1 minute to read.

How it works

The agent lists the checks needed, records the results it actually observes, and gives a pass, hold, or block decision. Missing or stale checks are listed as missing.

Technical content (original SKILL.md)

Original text by the author, straight from GitHub.

Verification Gate

This is an OMH verification-gate workflow skill, projected for Agent Skills hosts (Claude Code, Codex, Cursor, opencode, OpenClaw, pi).

Why This Exists

verification-gate gives OMH a deterministic evidence surface before done/merge claims, inspired by ECC-style gates but rebuilt around OMH's prepared-versus-observed contract.

Do Not Use When

  • The user asks for visual render QA; use omh-visual-qa.
  • The user asks for production release readiness beyond verification commands; use omh-production-audit.
  • The user wants a bug-first code review of a diff; use omh-code-review.

Examples

Good example:

  • Prompt: verification-gate 이 PR 머지 전에 build/lint/test/docs/CI 증거를 정리해서 PASS 가능한지 봐줘.
  • Expected behavior: Prepare verification_matrix/v1, record observed_check_results/v1, and issue PASS/HOLD/BLOCK with missing evidence.
  • Why: The user asks for claim verification across command and CI evidence.

Bad example:

  • Prompt: verification-gate 테스트 안 돌렸지만 준비됐다고 해줘.
  • Expected behavior: Return HOLD/BLOCK and list missing or stale checks instead of claiming readiness.
  • Why: A verification gate is useful only if planned checks and observed results stay separate.

Completion Checklist

  • The scenario, expected behavior, observed result, and pass/fail basis are named.
  • Proposed fixes are separated from observed QA evidence.
  • Missing or failed verification routes back to plan, fix, or a narrower test.

Recovery Notes

  • If the expected behavior is unclear, route back to plan before running adversarial checks.
  • If verification fails, return to fix or research with the failed signal instead of advancing.

When to Use

Use when Hermes must turn a change, PR, release, or claim into a concrete evidence checklist and PASS/HOLD/BLOCK verdict.

Strong routing signals: `verification-gate`, `verification gate`, `quality gate`, `release gate`, `test gate`, `build lint test`, `lint typecheck tests`, `verify before merge`, `merge readiness gate`, `generated file`, `generated artifact`, `generated output`, `source of truth`, `regenerate instead of editing`, `検証ゲート`, `品質ゲート`, `マージ前の検証`, `リリース前チェック`, `검증 게이트`, `품질 게이트`, `테스트 게이트`, `머지 전 검증`, `빌드 린트 테스트`, `перед мерджем проверь`, `проверь перед пушем`, `гейт проверки`, `проверь перед мерджем`, `докажи что тесты проходят`, `验证门禁`, `质量门禁`, `合并前验证`, `发布前检查`, `verifikasi sebelum merge`, `buktikan perubahan ini sudah selesai`, `cek bukti build lint dan tes`, `pastikan semua pemeriksaan lulus sebelum merge`, `tolong validasi hasil implementasi ini`, `xác minh trước khi gộp`, `xác minh trước khi merge`, `chứng minh thay đổi này đã hoàn thành`, `kiểm tra bằng chứng build lint và kiểm thử`, `đảm bảo mọi kiểm tra đều đạt trước khi gộp`, `đảm bảo tất cả kiểm tra đạt trước khi merge`, `hãy xác thực kết quả thực hiện này`

Catalog Metadata

Category: verification Phase: verification-gate Quality tier: verification-gated Reasoning demand: standard

Quality bar:

  • When adapting an existing capability, read ../omh-verification-gate/references/adaptation-quality.md before accepting a plan, dispatching work, or claiming completion; carry its criteria and comparisons into tasks and evidence.
  • Tie every completion claim to the smallest check that proves it, then broaden for shared surfaces.
  • When a diff touches a declared generated path, name its source of truth and regeneration command before the edit rather than after a byte gate rejects it; a diff touching a generator and its output together is the correct shape, not a violation — load references/generated-artifact-provenance.md for the declaration and reporting rules.
  • Record every field the observed_check_results/v1 artifact expectation below names, for each observed result (origin on a failing check only); a field left out is a gap in the record, not a shorter record.
  • For native omh_todo checkpoints, record then recall this verification declaration. Stored declarations are not proof.
  • When the change answers to a written spec, plan, or issue, load references/requirement-coverage-map.md and map requirement to task to evidence under stable ids before claiming coverage.
  • Give each failing check an origin: introduced when the same command passes at the merge-base or the failure points at a line the diff added or changed; pre_existing only when an observed run of the same command fails the same way at the merge-base in a clean detached worktree (`git worktree add --deta
FAQ

Does it run the tests itself?

It records and checks results that you or your tools observe. Planned checks are not treated as passed.

What if one test was skipped?

The gate reports it as missing evidence and gives a hold decision.

Is this the same as a code review?

No. A code review looks for bugs in a change, while this checks the proof of completion.

Details

Original description by the author

[omh] Proof a change is done before merge: define and record build, lint, typecheck, test, security, docs, generated-output, and CI evidence before completion or merge. Use when the user says: verification-gate, verification gate, quality gate, release gate, test gate, build lint test, lint typecheck tests, verify before merge.

repo: rlaope/oh-my-hermes

Popularity

GitHub stars
5.1k
Ranking position
#15174
License
MIT
Updated
11/2/2026

Is this skill useful?

0

Sign in to vote.

Comments

  • …

More skills from this repository

Similar skills