retrospective

What it does

This skill reviews a completed sprint or milestone to find what went well, what slowed the team and what to change. It is for team leads and producers who want to improve the next cycle.

When to use it

  • βœ“When a sprint or milestone has just finished and the team wants a structured review.
  • βœ“When a team wants to find the blockers that slowed the last iteration.
  • βœ“When a lead needs practical changes for the next sprint based on past results.

Skill link

https://github.com/Donchitos/Claude-Code-Game-Studios/blob/main/.claude/skills/retrospective/SKILL.md

Copy it and paste it into your AI (Claude, ChatGPT or Cursor), asking it to follow the instructions.

How to use

The easiest way: copy the message and paste it into your AI. It reads the skill and follows the instructions.

Ready-to-paste message

Use this skill to help me: https://github.com/Donchitos/Claude-Code-Game-Studios/blob/main/.claude/skills/retrospective/SKILL.md Read the SKILL.md file at that link and follow its instructions for my task.
Want your AI to find skills like this on its own?Install the free Skillpedia MCP: one line, and it searches 15,000+ skills before each task.Install in 1 minute β†’

Example of what to ask your AI

β€œRun a retrospective on last sprint and tell me what to change for the next one.”

5 new skills a week. 1 minute to read.

How it works

The skill reads the sprint records, completed work and blockers, and writes a report with practical insights. If the required data is missing, it reports that it could not run rather than making up results.

Technical content (original SKILL.md)

Original text by the author, straight from GitHub.

!bash "${CLAUDE_SKILL_DIR}/../../hooks/yaml-helper.sh" resolve_config --keys automation,workflow,qa.level

Retrospective

Every AskUserQuestion call follows .claude/docs/automation-modes.md (collaborative asks always Β· guided major-only Β· autonomous logs and proceeds; automation_always_ask categories always prompt).

Insufficient input β€” check this before producing any report

If the inputs this skill needs do not exist, the answer is "could not run" β€” not a filled-in report. Check first, and stop if the check fails.

  1. List the inputs this skill reads (data files, prior reports, profiler output, test results, registries, source code).
  2. For each, record FOUND or ABSENT β€” not "assumed present".
  3. If any input required for a section is ABSENT, that section is NOT ASSESSED β€” NO DATA. Do not estimate it, do not infer it from an adjacent artifact, and do not leave a mandated cell to be filled by whoever reads the template next.
  4. If every required input is ABSENT, stop and report NOT ASSESSED β€” NO DATA as the whole verdict, naming what was missing and which skill produces it.

A verdict of NOT ASSESSED is a success. It is the correct, useful answer to "what does the data say?" when there is no data. The failure mode this prevents is specific: a report whose verdict enum has no "could not run" state produces false clean passes β€” an asset audit returning COMPLIANT on a project with no assets and no standards, or a performance profile reporting ">99% headroom against a 16.67ms budget" with zero profiler data and no budget ever set.

Absence of evidence is never evidence of absence. A scan that finds no matches because there are no files to scan has not verified anything. Say which of the two happened β€” a reader cannot tell from a green result.


Phase 1: Parse Arguments

Determine whether this is a sprint retrospective (sprint-N) or a milestone retrospective (milestone-name).


Phase 1b: Check for Existing Retrospective

Before loading any data, glob for an existing retrospective file:

  • For sprint retrospectives: production/retrospectives/retro-[sprint-slug]-*.md (also check production/sprints/sprint-[N]-retrospective.md as an alternate location)
  • For milestone retrospectives: production/retrospectives/retro-[milestone-name]-*.md

If a matching file is found, use AskUserQuestion:

  • Prompt: "An existing retrospective was found: [filename]. How do you want to proceed?"
  • Options:
    • [A] Update existing β€” load it and add/revise sections with new data
    • [B] Start fresh β€” generate a new retrospective (archive the old one)

If [A]: read the existing file and carry its content forward, revising sections with new data. If [B]: continue to Phase 2 with a blank slate. Before writing the new file, rename the existing one with a -archived-[date] suffix. That rename is a write too: it happens in Phase 5, only once the ask there β€” which names it β€” is approved.


Phase 2: Load Sprint or Milestone Data

Read the sprint or milestone plan from the appropriate location:

  • Sprint plans: production/sprints/
  • Milestone definitions: production/milestones/

Also check for production/sprint-status.yaml: if it exists, read it alongside the sprint plan. It is the authoritative source for actual story completion status (status: done, completed dates, blockers). Use it as the primary source for completion metrics in Phase 3. Fall back to markdown scanning only if the yaml does not exist. Note discrepancies between the yaml and the sprint plan (e.g., stories in yaml not in plan, or vice versa).

If the file does not exist or is empty, output:

"No sprint data found for [sprint/milestone]. Run /sprint-plan new to create a sprint (/sprint-status only reads one), or provide the sprint details manually."

At workflow: minimal (resolved above) there are no sprints: offer to look back over the stories closed so far instead (production/epics/*/story-*.md with Status: Complete). At qa.level: minimal (resolved above) tests are waived, so a story closed without one is not a finding; a Visual/Feel or UI story closed without its retained screenshot still is.

Then use AskUserQuestion to present these options ([C] only at workflow: minimal):

  • [A] Provide data manually β€” ask the user to paste or describe the sprint tasks, dates, and outcomes; use that as the source of truth for the retrospective.
  • **[B]
FAQ

Does it need sprint records?

Yes. It reads completed work and records, and if they are missing it says so instead of producing a report.

What is velocity?

It is a measure of how much work the team finishes in each sprint.

Will the report invent results?

No. Missing sections are marked as not assessed rather than filled in with guesses.

Details

Original description by the author

Sprint or milestone retrospective from completed work, velocity, blockers. Actionable insights for the next iteration.

repo: Donchitos/Claude-Code-Game-Studios

Popularity

GitHub stars
33k
Ranking position
#8475
License
MIT
Updated
10/18/2026

Is this skill useful?

0

Sign in to vote.

Comments

  • …

More skills from this repository

Similar skills