scope-check
What it does
This skill compares what a team planned with what is actually being built, and points out any added work. It is for producers and leads who want to stop scope creep before it delays a release.
When to use it
- βWhen a feature or sprint is growing beyond its original plan and the team wants to know how much.
- βWhen a producer asks if there is any scope creep before a milestone.
- βWhen a team wants specific cuts suggested to bring a feature back in line.
Skill link
https://github.com/Donchitos/Claude-Code-Game-Studios/blob/main/.claude/skills/scope-check/SKILL.mdCopy it and paste it into your AI (Claude, ChatGPT or Cursor), asking it to follow the instructions.
How to use
The easiest way: copy the message and paste it into your AI. It reads the skill and follows the instructions.
Ready-to-paste message
For Claude Code, Codex or Cursor: run it in your project folder and the skill gets installed.
Download the SKILL.md and drop it into your agentβs skills folder.
Example of what to ask your AI
βCompare our inventory feature with its original plan and tell me if we have added scope.β
5 new skills a week. 1 minute to read.
How it works
The skill finds the original plan for the named feature, sprint or milestone, then checks the code, commit history and open to-do notes. It reports the additions and suggests what to cut, and it writes no files.
Technical content (original SKILL.md)
Original text by the author, straight from GitHub.
Scope Check
This skill is read-only β it reports findings but writes no files.
Compares original planned scope against current state to detect, quantify, and triage scope creep.
Argument: $ARGUMENTS β the whole string: a feature name (it may be several words), sprint number, or milestone name.
Phase 1: Find the Original Plan
Locate the baseline scope document for the given argument:
- Feature name β read
design/gdd/[feature].mdor matching file indesign/ - Sprint number (e.g.,
sprint-3) β readproduction/sprints/sprint-003.md(the name/sprint-planwrites) or similar - Milestone β read
production/milestones/[name].md
If the document is not found, report the missing file and stop. Do not proceed without
a baseline to compare against. Read a GDD by section: find the headings you need with
the Grep tool (pattern ^#, content mode) and Read those ranges with offset and
limit.
Phase 2: Read the Current State
Check what has actually been implemented or is in progress:
- Scan the codebase for files related to the feature/sprint
- Read git log for commits related to this work (
git log --oneline --since=[start-date]) - Check for TODO/FIXME comments that indicate unfinished scope additions
- Check active sprint plan if the feature is mid-sprint
Phase 3: Compare Original vs Current Scope
Produce the comparison report:
## Scope Check: [Feature/Sprint Name]
Generated: [Date]
### Original Scope
[List of items from the original plan]
### Current Scope
[List of items currently implemented or in progress]
> **If Phase 4 will return NOT ASSESSED, do not render the numeric block below.**
> Replace the counts and the Bloat Score with
> `[Baseline | Current state] unusable β see verdict` (whichever side could not
> be read) and give the reason. A rendered
> `Original items: 0 / Net scope change: 0%` one section above a NOT ASSESSED
> verdict re-creates the exact "0% reads as on track" hazard Phase 4 exists to
> kill, one phase earlier β and readers trust a number over a caveat.
### Scope Additions (not in original plan)
| Addition | Source | When | Justified? | Effort |
|----------|--------|------|------------|--------|
| [item] | [commit/person] | [date] | [Yes/No/Unclear] | [S/M/L] |
### Scope Removals (in original but dropped)
| Removed Item | Reason | Impact |
|-------------|--------|--------|
| [item] | [why removed] | [what's affected] |
### Bloat Score
- Original items: [N]
- Current items: [N]
- Items added: [N] (+[X]%)
- Items removed: [N]
- Net scope change: [+/-N] ([X]%)
### Risk Assessment
- **Schedule Risk**: [Low/Medium/High] β [explanation]
- **Quality Risk**: [Low/Medium/High] β [explanation]
- **Integration Risk**: [Low/Medium/High] β [explanation]
### Recommendations
1. **Cut**: [Items that should be removed to stay on schedule]
2. **Defer**: [Items that can move to a future sprint/version]
3. **Keep**: [Additions that are genuinely necessary]
4. **Flag**: [Items that need a decision from producer/creative-director]
Phase 4: Verdict
Assign a canonical verdict based on net scope change:
| Net Change | Verdict | Meaning |
|---|---|---|
| β€10% | PASS | On Track β within acceptable variance |
| >10β25% | CONCERNS | Minor Creep β manageable with targeted cuts |
| >25β50% | FAIL | Significant Creep β must cut or formally extend timeline |
| >50% | FAIL | Out of Control β stop, re-plan, escalate to producer |
Before applying that table, check that the percentage means something. Emit NOT ASSESSED instead β never a computed percentage β when any of:
- The baseline document exists but enumerates no scope items (all headings,
placeholders, or
[TO BE CONFIGURED]). Phase 1 stops when the file is absent; this is the case where it is present and empty, and it is the more dangerous one, because zero items yields a 0% net change that renders as PASS β On Track. Nothing was compared. Nothing was on track. - The current state cannot be determined β no related source files, no commits in the window, nothing in progress to read. Comparing a real baseline against an unreadable present is not a 0% change, and not the β100% that zero current items computes β the table reads both as PASS.
- The denominator would be zero for any other reason. A percentage computed from no baseline items is not a small number; it is not a number.
NOT ASSESSED outranks PASS
FAQ
What do I need to give it?
A feature name, sprint number or milestone name is needed, and a matching plan document must exist.
What if the plan document cannot be found?
The skill reports the missing file and stops, since it needs a plan to compare against.
Does it change any files?
No. It is read-only and only reports its findings.
Details
Original description by the author
Scope creep check β current scope versus the original plan. Flags additions, quantifies bloat, recommends cuts. 'Any scope creep?'
Popularity
- GitHub stars
- 33k
- Ranking position
- #8478
- License
- MIT
- Updated
- 10/18/2026
Comments
- β¦
More skills from this repository
adopt
33kChecks whether an existing game project's documents follow the studio template's formats, then writes a numbered migration plan to fix any gaps.
architecture-decision
33kWrites an architecture decision record for a technical choice, covering context, alternatives, and consequences, with review by the right technical roles.
architecture-review
33kChecks that your technical decisions cover every design requirement, do not conflict, and fit the engine version, with a clear pass or concern verdict.
art-bible
33kWrites an art bible that defines your game's visual identity, so asset production follows one clear set of style rules.
Similar skills
knowledge-capture
394kTeaches your agent to save decisions, preferences, and key facts to your Knowledge vault as short notes with source attribution.
knowledge-claim-consolidation
394kHelps your agent tidy a Knowledge vault by merging duplicate claims, moving them to the right subject pages, and retiring outdated ones.
knowledge-correct
394kLets your agent fix or withdraw a specific saved Knowledge claim or page at your request, keeping a record of what changed.