What it does

This skill sorts stakeholders on two grids: how much they care about and can influence the work, and how much the product affects them compared with how much power they hold. It is for product managers setting an engagement strategy after listing stakeholders.

When to use it

  • βœ“When you have a stakeholder list and need to decide who to involve most closely.
  • βœ“When you suspect the people most affected by a product have little say in it.
  • βœ“When you want an engagement strategy that covers both the powerful and the affected.

Skill link

https://github.com/deanpeters/Product-Manager-Skills/blob/main/skills/stakeholder-mapping/SKILL.md

Copy it and paste it into your AI (Claude, ChatGPT or Cursor), asking it to follow the instructions.

How to use

The easiest way: copy the message and paste it into your AI. It reads the skill and follows the instructions.

Ready-to-paste message

Use this skill to help me: https://github.com/deanpeters/Product-Manager-Skills/blob/main/skills/stakeholder-mapping/SKILL.md Read the SKILL.md file at that link and follow its instructions for my task.
Want your AI to find skills like this on its own?Install the free Skillpedia MCP: one line, and it searches 15,000+ skills before each task.Install in 1 minute β†’

Example of what to ask your AI

β€œMap my stakeholders on power and interest, and again on impact and power. Who am I under-engaging?”

5 new skills a week. 1 minute to read.

How it works

It runs a power and interest grid to suggest how deeply to involve each person, and an impact and power grid to find high-impact, low-power groups. It then compares the two.

Technical content (original SKILL.md)

Original text by the author, straight from GitHub.

Stakeholder Mapping

Purpose

Prioritize stakeholders and set engagement strategy. This skill runs two complementary grids on your identified stakeholder set and deliberately compares what they reveal, because each grid shows you something the other cannot.

Power Γ— Interest answers: how much does each stakeholder care about this initiative, and how much can they influence it? It produces engagement strategies β€” who to involve deeply, who to keep informed, who to monitor. This is the grid most PMs know.

Impact Γ— Power answers: who bears the consequences of this product's outcomes, and how much organizational power do they actually hold? It surfaces the stakeholders who matter most to get right but are most likely to be underrepresented β€” high impact, low power.

Running only the first grid optimizes for managing relationships with the powerful. Running only the second produces an equity analysis without an engagement plan. The insight lives in comparing them: a stakeholder who appears in "keep informed" on the first grid and "high impact, low power" on the second is someone you've been under-engaging with consequences that fall entirely on them. That's a product risk.

Use this after stakeholder-identification (which builds the full list) and before stakeholder-engagement-advisor (which plans per-stakeholder outreach).

Input

Works best with: Your identified stakeholder list (ideally from stakeholder-identification). Also useful: What you know about each person's power, interest, and current stance, plus the engagement decisions the map must drive.

Anything supplied with the invocation itself β€” text after the skill name, a pasted context dump, or an appended ARGUMENTS: line β€” counts as answers already given. Use it and skip whatever it covers; don't re-ask.

Arriving empty-handed? That works too. The skill asks for the stakeholder set first β€” mapping unidentified stakeholders just formalizes your blind spots.

Example invocation: Map these 14 stakeholders for the billing migration on both grids β€” list attached with role notes.

Key Concepts

Power Γ— Interest Grid β€” A 2Γ—2 that plots stakeholders by their power to affect the initiative (vertical axis) and their interest in its outcome (horizontal axis). Produces four quadrants with prescribed engagement strategies:

  • High power, high interest β†’ Manage closely (co-design, frequent touchpoints)
  • High power, low interest β†’ Keep satisfied (executive briefings, strategic framing)
  • Low power, high interest β†’ Keep informed (newsletters, demos, transparency)
  • Low power, low interest β†’ Monitor (light touch, check-ins only)

Impact Γ— Power Grid β€” A 2Γ—2 that plots stakeholders by whether they are significantly affected by the initiative (vertical axis) and the power they hold to shape it (horizontal axis). Produces four quadrants:

  • High impact, high power β†’ Q2 β€” impacted and empowered; manage closely
  • High impact, low power β†’ Q1 β€” impacted but marginalized; elevate their voice deliberately
  • Low impact, high power β†’ Q4 β€” gatekeepers; manage relationship, lower engagement depth
  • Low impact, low power β†’ Q3 β€” monitor, minimal investment

Elevating Q1 Voices β€” High-impact, low-power stakeholders (Q1) are the people most likely to experience your product's failure modes and least likely to appear in your normal feedback loops. Deliberately increasing their role in roadmap decisions β€” through research recruitment, usability testing, and requirements review β€” is not just equitable; it reduces the product risk of building for the wrong problems.

Quadrant Migration β€” The deliberate strategy of moving a stakeholder from their current quadrant to a desired one through targeted actions. A skeptical executive currently in "monitor" who needs to become a sponsor requires a different set of actions than one already in "manage closely." Making migration explicit turns the map from a snapshot into a plan.

Impact vs. Power β€” These are not the same dimension. A frontline support agent has high impact (their daily workflow changes completely) but low power (no seat at the roadmap table). A VP of Finance has high power (budget approval) but low impact (the product doesn't change how they work). Conflating the two is the most common mapping error.

Paired Variables β€” The reason to run both grids rather than one. Different paired axes reveal different relationships. A single grid produces a singl

FAQ

Why use two grids?

The power and interest grid helps manage relationships, while the impact and power grid shows who bears the consequences.

What is the key insight?

A stakeholder kept only informed who bears high impact is a product risk you may have missed.

Does it come before identification?

No. It works on the list that stakeholder identification builds, so identification comes first.

Details

Original description by the author

Prioritize stakeholders using two complementary grids. Use when setting engagement strategy and surfacing whose voice needs elevating after stakeholder identification.

repo: deanpeters/Product-Manager-Skills

Popularity

GitHub stars
7.8k
Ranking position
#12815
License
β€”
Updated
10/15/2026

Is this skill useful?

0

Sign in to vote.

Comments

  • …

More skills from this repository

Similar skills