Skip to content
Skillpedia
Tasks & projects33k Β· #8507

vertical-slice

What it does

This skill guides a vertical slice, a playable build of one complete loop that tests whether the full game is achievable. It is for game teams in late pre-production who must decide whether to commit to full production.

When to use it

  • βœ“When game design, architecture and UX specs are finished and the team wants to test a full loop.
  • βœ“When an earlier vertical slice led to a pivot and the design must be checked again.
  • βœ“When a team needs velocity data to estimate its real production rate.

Skill link

https://github.com/Donchitos/Claude-Code-Game-Studios/blob/main/.claude/skills/vertical-slice/SKILL.md

Copy it and paste it into your AI (Claude, ChatGPT or Cursor), asking it to follow the instructions.

How to use

The easiest way: copy the message and paste it into your AI. It reads the skill and follows the instructions.

Ready-to-paste message

Use this skill to help me: https://github.com/Donchitos/Claude-Code-Game-Studios/blob/main/.claude/skills/vertical-slice/SKILL.md Read the SKILL.md file at that link and follow its instructions for my task.
Want your AI to find skills like this on its own?Install the free Skillpedia MCP: one line, and it searches 15,000+ skills before each task.Install in 1 minute β†’

Example of what to ask your AI

β€œPlan a vertical slice that proves our full combat loop is achievable before we commit to production.”

5 new skills a week. 1 minute to read.

How it works

The skill checks the design and architecture documents, then guides the build of one start-to-finish loop. It judges the result on pipeline, feasibility, fun and velocity, and gives a verdict.

Technical content (original SKILL.md)

Original text by the author, straight from GitHub.

!bash "${CLAUDE_SKILL_DIR}/../../hooks/yaml-helper.sh" resolve_config --keys review_mode,automation,workflow

Resolved above β€” use as-is; --review overrides review_mode for this run. No block β†’ defaults in .claude/docs/config-resolution.md.

Vertical Slice

Purpose

The vertical slice answers a different question from the concept prototype: "Can we build this full game loop at production quality, on schedule?"

Default use β€” run late in Pre-Production, after GDDs, architecture, and UX specs are complete. It is a near-production-quality build demonstrating one complete [start β†’ challenge β†’ resolution] cycle.

Post-pivot? If a PIVOT verdict from an earlier vertical slice sent you back to revise GDDs and architecture, run this again after revisions to re-validate. It can be run as many times as needed until a PROCEED or KILL verdict is reached.

It validates:

  1. The pipeline (can the team actually produce this quality of content?)
  2. Execution feasibility (are the architecture decisions correct for this game?)
  3. Fun survival (does the fun from the concept prototype survive full design?)
  4. Velocity (how long did this take? That's your real production rate estimate.)

Earlier in the project? If you haven't written GDDs yet and want to validate whether the core idea is worth designing, run /prototype (concept prototype) instead.


Phase 1: Resolve Review Mode and Load Context

See .claude/docs/director-gates.md for the full check pattern. Individual gate definitions live in .claude/docs/director-gates/[gate-id].md β€” the spawned agent reads its own gate file; do not read it in the parent session.

Every AskUserQuestion call follows .claude/docs/automation-modes.md (collaborative asks always Β· guided major-only Β· autonomous logs and proceeds; automation_always_ask categories always prompt).

Read the following files to understand the full design intent. Read each GDD, ADR and the control manifest by section: find the headings you need with the Grep tool (pattern ^#, content mode) and Read those ranges with offset and limit.

  • CLAUDE.md β€” tech stack and engine
  • design/gdd/game-concept.md β€” core fantasy and game pillars (or design/game-brief.md, the one-page brief that replaces it at rigor: minimal β€” pitch, core loop and "what they feel" line; it has no pillars)
  • design/gdd/systems-index.md β€” MVP systems and their priorities
  • docs/architecture/architecture.md β€” layer structure
  • docs/architecture/control-manifest.md β€” technical rules for implementation
  • Key GDDs for the systems being sliced

Phase 2: Define the Slice Scope and Validation Question

Before building, define the falsifiable validation question:

"Does a player, starting from nothing, experience [core fantasy from game-concept.md or game-brief.md] within [N] minutes, without developer guidance β€” and can we build one such loop in [X] days at representative quality?"

Both parts matter: player experience AND build feasibility.

Scope discipline:

  • Include ALL core loop systems (minimum). If a system is required to complete one [start β†’ challenge β†’ resolution] cycle, it must be in the slice.
  • Target scope: 3–5 minutes of polished, continuous gameplay. This is the industry-standard vertical slice length β€” long enough to demonstrate mechanics and tone, short enough to build at representative quality. If your slice would take longer than 5 minutes to play through, cut content, not quality.
  • Cut scope before cutting quality. A low-quality slice that looks nothing like the intended game cannot validate production feasibility.
  • If the scope feels too large to build in 1–3 weeks, the slice scope is wrong β€” not too big to build, but the slice is trying to prove too much at once.

Scope creep warning: The vertical slice is the highest-risk moment for scope creep in the pre-production phase. Features feel "almost there" and it's tempting to add "just one more system." Resist this. Cut, do not extend.

Present scope to the user before building and get confirmation.


Phase 3: Plan the Build

Define in bullet points:

  • Systems implemented (which GDD sections are being exercised)
  • The complete game loop cycle ([start] β†’ [challenge] β†’ [resolution] exactly)
  • Art and audio quality level (placeholder acceptable, representative preferred)
  • Specific, measurable success criteria for the validation question
  • Hard time limit: [X] days. If exceed
FAQ

Is a vertical slice the same as a prototype?

No. A prototype tests whether an idea is fun, while a vertical slice tests whether the full game can be built on schedule.

What verdicts can it give?

It gives proceed, pivot or kill, and a pivot sends the team back to revise the design.

Why does it measure velocity?

The time taken gives the team a real production rate for later estimates.

Details

Original description by the author

Pre-production validation β€” end-to-end build to confirm the full loop is achievable before committing to Production. After GDDs, architecture, UX specs.

repo: Donchitos/Claude-Code-Game-Studios

Popularity

GitHub stars
33k
Ranking position
#8507
License
MIT
Updated
10/18/2026

Is this skill useful?

0

Sign in to vote.

Comments

  • …

More skills from this repository

Similar skills