energy-procurement
Fungsinya
Agen ini membantu bisnis membeli listrik dan gas alam dengan lebih efisien. Agen ini menganalisis biaya energi, mencari pemasok terbaik, dan menegosiasikan kontrak untuk menghemat biaya serta memastikan pasokan tetap stabil.
Kapan dipakai
- โSaat mencari pemasok energi baru untuk fasilitas Anda.
- โSaat Anda ingin memahami dan mengurangi biaya permintaan daya (demand charges).
- โSaat mengevaluasi penawaran energi terbarukan, seperti tenaga surya atau angin.
Link skill
https://github.com/affaan-m/ECC/blob/main/skills/energy-procurement/SKILL.mdSalin lalu tempelkan ke AI Anda (Claude, ChatGPT, atau Cursor) dan minta AI mengikuti instruksinya.
Cara pakai
Cara paling mudah: salin pesan ini dan tempelkan ke AI Anda. AI akan membaca skill dan mengikuti instruksinya.
Pesan siap tempel
Untuk Claude Code, Codex, atau Cursor: jalankan di folder proyek, lalu skill langsung terpasang.
Unduh SKILL.md lalu taruh di folder skill agen Anda.
Contoh permintaan ke AI
โSaya perlu mencari pemasok listrik untuk 5 pabrik saya di wilayah Selatan dan ingin menegosiasikan kontrak harga tetap selama 3 tahun. Apa saja pilihan terbaiknya?โ
5 skill baru setiap minggu. 1 menit baca.
Cara kerjanya
Agen ini menganalisis data konsumsi energi fasilitas Anda untuk memahami cara dan waktu energi digunakan. Berdasarkan itu, agen membandingkan berbagai paket dan pemasok untuk menemukan penawaran terbaik, dengan mempertimbangkan biaya, risiko, dan target keberlanjutan.
Konten teknis (SKILL.md asli)
Teks asli dari pembuat, dalam bahasa Inggris, langsung dari GitHub.
Energy Procurement
Role and Context
You are a senior energy procurement manager at a large commercial and industrial (C&I) consumer with multiple facilities across regulated and deregulated electricity markets. You manage an annual energy spend of $15Mโ$80M across 10โ50+ sites โ manufacturing plants, distribution centers, corporate offices, and cold storage. You own the full procurement lifecycle: tariff analysis, supplier RFPs, contract negotiation, demand charge management, renewable energy sourcing, budget forecasting, and sustainability reporting. You sit between operations (who control load), finance (who own the budget), sustainability (who set emissions targets), and executive leadership (who approve long-term commitments like PPAs). Your systems include utility bill management platforms (Urjanet, EnergyCAP), interval data analytics (meter-level 15-minute kWh/kW), energy market data providers (ICE, CME, Platts), and procurement platforms (energy brokers, aggregators, direct ISO market access). You balance cost reduction against budget certainty, sustainability targets, and operational flexibility โ because a procurement strategy that saves 8% but exposes the company to a $2M budget variance in a polar vortex year is not a good strategy.
When to Use
- Running an RFP for electricity or natural gas supply across multiple facilities
- Analyzing tariff structures and rate schedule optimization opportunities
- Evaluating demand charge mitigation strategies (load shifting, battery storage, power factor correction)
- Assessing PPA (Power Purchase Agreement) offers for on-site or virtual renewable energy
- Building annual energy budgets and hedge position strategies
- Responding to market volatility events (polar vortex, heat wave, regulatory changes)
How It Works
- Profile each facility's load shape using interval meter data (15-minute kWh/kW) to identify cost drivers
- Analyze current tariff structures and identify optimization opportunities (rate switching, demand response enrollment)
- Structure procurement RFPs with appropriate product specifications (fixed, index, block-and-index, shaped)
- Evaluate bids using total cost of energy (not just $/MWh) including capacity, transmission, ancillaries, and risk premium
- Execute contracts with staggered terms and layered hedging to avoid concentration risk
- Monitor market positions, rebalance hedges on trigger events, and report budget variance monthly
Examples
- Multi-site RFP: 25 facilities across PJM and ERCOT with $40M annual spend. Structure the RFP to capture load diversity benefits, evaluate 6 supplier bids across fixed, index, and block-and-index products, and recommend a blended strategy that locks 60% of volume at fixed rates while maintaining 40% index exposure.
- Demand charge mitigation: Manufacturing plant in Con Edison territory paying $28/kW demand charges on a 2MW peak. Analyze interval data to identify the top 10 demand-setting intervals, evaluate battery storage (500kW/2MWh) economics against load curtailment and power factor correction, and calculate payback period.
- PPA evaluation: Solar developer offers a 15-year virtual PPA at $35/MWh with a $5/MWh basis risk at the settlement hub. Model the expected savings against forward curves, quantify basis risk exposure using historical node-to-hub spreads, and present the risk-adjusted NPV to the CFO with scenario analysis for high/low gas price environments.
Core Knowledge
Pricing Structures and Utility Bill Anatomy
Every commercial electricity bill has components that must be understood independently โ bundling them into a single "rate" obscures where real optimization opportunities exist:
- Energy charges: The per-kWh cost for electricity consumed. Can be flat rate (same price all hours), time-of-use/TOU (different prices for on-peak, mid-peak, off-peak), or real-time pricing/RTP (hourly prices indexed to wholesale market). For large C&I customers, energy charges typically represent 40โ55% of the total bill. In deregulated markets, this is the component you can competitively procure.
โฆ
Pertanyaan umum
Apa itu 'demand charges'?
Ini adalah biaya yang dikenakan berdasarkan daya puncak yang digunakan bisnis Anda. Jika Anda menggunakan energi dalam jumlah besar dalam waktu singkat, meskipun tidak sering, biaya ini bisa membuat tagihan Anda meningkat secara signifikan.
Apa itu PPA (Power Purchase Agreement)?
PPA adalah kontrak jangka panjang untuk membeli listrik, sering kali dari sumber terbarukan seperti surya atau angin, langsung dari pengembang. Kontrak ini membantu mengamankan harga energi dan mendukung target keberlanjutan.
Bagaimana agen ini membantu dalam energi terbarukan?
Agen ini dapat menganalisis penawaran proyek energi terbarukan (PPA) dan mengevaluasi kredit energi terbarukan (REC), sehingga bisnis Anda dapat memenuhi target keberlanjutan serta memahami biaya dan manfaatnya.
Detail
Deskripsi asli dari pembuat
Procure electricity and natural gas for commercial and industrial facilities: tariff and rate-schedule optimization, demand-charge mitigation, supplier RFPs, fixed/index/block-and-index hedging, renewable PPA and REC evaluation, and sustainability reporting. Use when procuring energy, optimizing utility tariffs, managing demand charges, evaluating PPAs, or building energy budgets and hedge strateg
repo: affaan-m/ECC
Popularitas
- Bintang GitHub
- 280k
- Peringkat
- #308
- Lisensi
- MIT
- Diperbarui
- 15/10/2026
Komentar
- โฆ
Skill lain dari repositori ini
accessibility
280kMembantu agent Anda membuat antarmuka yang ramah untuk semua orang. Memastikan website dan aplikasi tetap bisa dipakai penyandang disabilitas, seperti tunanetra.
agent-architecture-audit
280kMembuat agent Anda memeriksa apakah semuanya berjalan dengan benar. Agent akan menemukan dan memperbaiki masalah pada sistem AI agar bekerja sesuai harapan.
agent-eval
280kMembantu agent Anda membandingkan berbagai alat coding AI. Mengukur mana yang lebih cepat, lebih murah, dan lebih andal untuk tugas tertentu.
agent-harness-construction
280kMembuat agent Anda lebih memahami cara menyelesaikan tugas. Agent mengoptimalkan alat dan instruksi yang digunakan agar peluang berhasilnya lebih besar.
Skill serupa
blucli
394kMembantu agent Anda menemukan, memutar, menjeda, mengelompokkan, dan mengatur volume speaker Bluesound dan NAD lewat perintah blu.
camsnap
394kMembantu agent Anda mengambil foto, klip pendek, atau peristiwa gerakan dari kamera jaringan dan webcam lokal yang sudah Anda atur.
eightctl
394kMembantu agent Anda memeriksa dan mengendalikan perangkat Eight Sleep, termasuk suhu, alarm, dan jadwal tidurnya.