root-cause-pareto

Fungsinya

Skill ini menyusun analisis berperingkat tentang masalah, seperti downtime mesin, cacat, atau keluhan, untuk menunjukkan penyebab mana yang paling penting. Skill ini untuk tim operasi dan mutu yang membutuhkan temuan yang bertahan dalam rapat manajemen.

Kapan dipakai

  • ✓Saat Anda ingin memeringkat penyebab downtime mesin, cacat, atau keluhan.
  • ✓Ketika Anda memerlukan rincian 80/20 yang kemungkinan akan ditantang oleh manajer.
  • ✓Saat Anda ingin melihat apakah masalah teratas tetap sama di setiap periode.

Link skill

https://github.com/davila7/claude-code-templates/blob/main/cli-tool/components/skills/operations/root-cause-pareto/SKILL.md

Salin lalu tempelkan ke AI Anda (Claude, ChatGPT, atau Cursor) dan minta AI mengikuti instruksinya.

Cara pakai

Cara paling mudah: salin pesan ini dan tempelkan ke AI Anda. AI akan membaca skill dan mengikuti instruksinya.

Pesan siap tempel

Gunakan skill ini untuk membantu saya: https://github.com/davila7/claude-code-templates/blob/main/cli-tool/components/skills/operations/root-cause-pareto/SKILL.md Baca file SKILL.md di link tersebut dan ikuti instruksinya untuk tugas saya.
Mau AI Anda menemukan skill seperti ini sendiri?Pasang MCP Skillpedia gratis: cukup satu baris, dan AI mencari di antara 15.000+ skill sebelum tiap tugas.Pasang dalam 1 menit →

Contoh permintaan ke AI

“Susun Pareto penyebab downtime dari log pemeliharaan saya, diurutkan berdasarkan menit yang hilang, bukan hanya jumlah kejadian.”

5 skill baru setiap minggu. 1 menit baca.

Cara kerjanya

Agent memilih satuan ukur yang tepat, membersihkan kategori, menormalkan berdasarkan paparan seperti jam mesin, memeriksa stabilitas di setiap periode, lalu memeringkat dan memplot hasilnya.

Konten teknis (SKILL.md asli)

Teks asli dari pembuat, dalam bahasa Inggris, langsung dari GitHub.

Root-Cause Pareto

A Pareto chart is easy; a Pareto that survives challenge in a management meeting is not. The difference is four disciplines applied before the chart exists.

Workflow

  1. Pick the unit of measure deliberately. Occurrences, minutes, or money - choose the one closest to the pain being managed and say why. Ranking breakdowns by count when one category costs 10x more minutes per event points the team at the wrong problem. When in doubt, show count and impact side by side.
  2. Enforce category hygiene before counting:
    • Categories must sit at one granularity level (no "Mechanical failure" next to "Sensor S-114 misaligned")
    • "Other/Miscellaneous" must stay under ~15% of the total; if it is bigger, the categorization failed - split it before proceeding
    • Merge synonyms and near-duplicates (free-text logs always contain them; list the merges made)
  3. Normalize by exposure before comparing. Line A with 3 shifts will "lead" any raw ranking against Line B with 1 shift. Divide by machine-hours, orders, or units produced when comparing across lines, shifts, or periods - state the exposure base used.
  4. Check stability. A Pareto from one bad week is an anecdote. Compare the ranking across at least two comparable periods; only categories that stay on top deserve investment. Note rank changes.
  5. Rank, plot, and go one level deeper on the #1 category. Break the top category into its own sub-Pareto or apply 5-why prompts to its most frequent instances. The actionable cause is usually one level below the headline category.
  6. Define the counter-metric. Before recommending an action, state which number should move, by roughly how much, and when to re-measure. A Pareto without a follow-up measurement is decoration.

Pitfalls to check explicitly

  • Unit mismatch (count vs duration vs cost) silently reordering priorities
  • Unnormalized cross-line comparisons
  • "Other" as the tallest bar
  • Categories mixing symptoms ("stopped") with causes ("no material")
  • Acting on unstable rankings from short windows

Output format

  1. One sentence: unit of measure, exposure base, period, and total impact covered
  2. The ranked table (category, impact, share, cumulative) - chart optional, table mandatory
  3. Sub-analysis of the top category with candidate root causes
  4. Recommended action + counter-metric + re-measure date
  5. Data notes: merges performed, rows excluded, Other%

Source: industrial-engineering-ai-skills by Eren Gulmez (MIT). The full method pack - entry skill, role agents, data-hygiene rules and artifact templates - lives there.

Pertanyaan umum

Mengapa memeringkat berdasarkan menit, bukan jumlah?

Karena satu kategori dapat menghabiskan waktu yang jauh lebih banyak per kejadian, sehingga jumlah bisa mengarahkan tim ke masalah yang salah.

Berapa batas untuk kategori Lainnya?

Skill ini menjaga Lainnya atau Miscellaneous di bawah sekitar 15 persen. Jika lebih besar, kategorinya perlu dipecah.

Apakah Pareto adalah akhir dari analisis?

Tidak. Skill ini memperlakukannya sebagai awal dari investigasi akar masalah, dengan metrik tindak lanjut.

Detail

Deskripsi asli dari pembuat

Build a decision-grade Pareto for downtime, defects, complaints or delays - with unit-of-measure discipline, category hygiene, exposure normalization and a follow-up metric. Use when the user mentions pareto analysis, kök neden, duruş analizi, downtime, arıza analizi, defect ranking, şikayet analizi, 80/20 analysis. Differentiator - treats the Pareto as the start of a causal investigation, not a bar chart deliverable.

repo: davila7/claude-code-templates

Popularitas

Bintang GitHub
33k
Peringkat
#8867
Lisensi
MIT
Diperbarui
2/11/2026

Apakah skill ini berguna?

0

Masuk untuk memberi suara.

Komentar

  • …

Skill lain dari repositori ini

Skill serupa