sprint-status
Fungsinya
Skill ini memberikan pembaruan singkat dan hanya-baca tentang bagaimana sprint saat ini berjalan. Cocok untuk anggota tim yang ingin gambaran cepat tanpa tinjauan lengkap.
Kapan dipakai
- βSaat anggota tim bertanya bagaimana perkembangan sprint dan menginginkan jawaban cepat.
- βSaat seorang produser ingin melihat risiko yang muncul dalam sprint saat ini.
- βSaat seseorang membutuhkan pemeriksaan kemajuan cepat sebelum stand-up harian.
Link skill
https://github.com/Donchitos/Claude-Code-Game-Studios/blob/main/.claude/skills/sprint-status/SKILL.mdSalin lalu tempelkan ke AI Anda (Claude, ChatGPT, atau Cursor) dan minta AI mengikuti instruksinya.
Cara pakai
Cara paling mudah: salin pesan ini dan tempelkan ke AI Anda. AI akan membaca skill dan mengikuti instruksinya.
Pesan siap tempel
Untuk Claude Code, Codex, atau Cursor: jalankan di folder proyek, lalu skill langsung terpasang.
Unduh SKILL.md lalu taruh di folder skill agen Anda.
Contoh permintaan ke AI
βBagaimana perkembangan sprint? Berikan saya cuplikan singkat.β
5 skill baru setiap minggu. 1 menit baca.
Cara kerjanya
Skill menemukan file sprint saat ini, memindai penanda status pada ceritanya, dan menulis cuplikan singkat. Skill tidak pernah mengubah file dan paling banyak memberikan satu rekomendasi.
Konten teknis (SKILL.md asli)
Teks asli dari pembuat, dalam bahasa Inggris, langsung dari GitHub.
!bash "${CLAUDE_SKILL_DIR}/../../hooks/yaml-helper.sh" resolve_config --keys story_granularity,workflow
Sprint Status
This is a fast situational awareness check, not a sprint review. It reads the
current sprint plan and story files, scans for status markers, and produces a
concise snapshot in under 30 lines. For detailed sprint management, use
/sprint-plan update or /milestone-review.
This skill is read-only. It never proposes changes, never asks to write files, and makes at most one concrete recommendation.
story_granularity β it sets the
grain of the burn-down read: feature-sized chunks at coarse (the default, via rigor: minimal), task-sized
at balanced (rigor: standard), AC-sized at fine.
1. Find the Sprint
Argument: $ARGUMENTS (blank = use current sprint)
- If an argument is given (e.g.,
/sprint-status 3), searchproduction/sprints/for a file matchingsprint-003.md,sprint-03.md,sprint-3.md, or similar (/sprint-planwrites three digits). Report which file was found. - If no argument is given, find the most recently modified file in
production/sprints/and treat it as the current sprint. - If
production/sprints/does not exist or is empty:- At
workflow: minimalthere are no sprints by design β the brief's build order is the plan and the story files carry it. Report progress through it instead, then stop:- The list below was printed by
.claude/scripts/story-status.shbefore you read this skill: one line per unfinished story, already in the route's order (IN_REVIEW,IN_PROGRESS, thenTODOβ aReadyorNot Startedstory β in build order), thenBLOCKED,OTHER,NO_STATUSand theCOMPLETEcount:
- The list below was printed by
- At
!bash "${CLAUDE_SKILL_DIR}/../../scripts/story-status.sh"
2. Print, in under 15 lines: `Build order: [N] of [M] stories complete`
from the `COMPLETE` line (count only `Complete` and `Done` stories β
`In Review` is not complete), then **Next**: the story on the first
`IN_REVIEW`, `IN_PROGRESS` or `TODO` line. The list is already
current; do not run the script again, and do not re-rank the story files β an `In Review` story is closed before an
`In Progress` one continues: its work is written. Recommend
`/story-done [path]` for `IN_REVIEW`, `/dev-story [path]` for
`IN_PROGRESS` or `TODO`. Name any `BLOCKED` story with its blocker; it is
never Next.
3. Every story `Complete` (or `Done`) β "Build order done: [M] of [M]
stories complete." Offer three ways on: play the build; add the next
stories from the brief with `/create-stories`; or `/settings` to raise
`modes.rigor` if the game has outgrown a one-page brief.
4. `STORIES none` β no story files at all β "No stories yet. Run
`/create-stories` to turn the brief's build order into stories."
5. No `IN_REVIEW`, `IN_PROGRESS` or `TODO` line, yet the `COMPLETE` line
is short of the total β every unfinished story is `BLOCKED`, `OTHER`
(such as `Draft`) or `NO_STATUS`. There is **no Next**, and the build
order is **not** done: never say it is. Print the `Build order` line,
then name each `BLOCKED` story with its blocker β read from its story
file, usually a `BLOCKED:` note β and each other story with its status
as written. Recommend one step: what the first blocker needs, or else
finishing the first `Draft` or unstatused story and setting its Status
to `Ready`.
- At
standardorfull, report: "No sprint files found. Start a sprint with/sprint-plan new." Then stop.
Read the sprint file in full. Extract:
- Sprint number and goal
- Start date and end date
- All story or task entries with their priority (Must Have / Should Have / Nice to Have), owner, and estimate
2. Calculate Days Remaining
Using today's date and the sprint end date from the sprint file, calculate:
- Total sprint days (end minus start)
- Days elapsed
- Days remaining
- Percentage of time consumed
If the sprint file does not include explicit dates, note "Sprint dates not found β burndown assessment skipped."
3. Scan Story Status
First: check for production/sprint-status.yaml.
If it exists, read it directly β it is the authoritative source of truth.
Extract each story's status, and its priority, owner and blocker when set β they fill the status table's columns. N
Pertanyaan umum
Apakah skill ini mengubah rencana sprint?
Tidak. Skill hanya membaca dan tidak pernah mengusulkan atau menulis perubahan.
Bisakah saya memeriksa sprint yang lebih lama?
Bisa. Berikan nomor sprint dan skill akan mencari file yang cocok.
Bagaimana jika belum ada sprint?
Pada tingkat alur kerja paling ringan memang tidak ada sprint, jadi skill melaporkan kemajuan dari file cerita sebagai gantinya.
Detail
Deskripsi asli dari pembuat
Fast, concise sprint snapshot β burndown and emerging risks for situational awareness. 'How is the sprint going?'
Popularitas
- Bintang GitHub
- 33k
- Peringkat
- #8487
- Lisensi
- MIT
- Diperbarui
- 18/10/2026
Komentar
- β¦
Skill lain dari repositori ini
adopt
33kMemeriksa apakah dokumen proyek game yang sudah ada mengikuti format template studio, lalu menulis rencana migrasi bernomor untuk memperbaiki celah yang ditemukan.
architecture-decision
33kMenulis catatan keputusan arsitektur untuk pilihan teknis, mencakup konteks, alternatif, dan konsekuensi, dengan tinjauan dari peran teknis yang tepat.
architecture-review
33kMemeriksa bahwa keputusan teknis Anda mencakup setiap kebutuhan desain, tidak saling bertentangan, dan sesuai versi mesin, dengan vonis lulus atau kekhawatiran yang jelas.
art-bible
33kMenulis art bible yang mendefinisikan identitas visual game Anda, sehingga produksi aset mengikuti satu rangkaian aturan gaya yang jelas.
Skill serupa
knowledge-capture
394kMengajari agent Anda menyimpan keputusan, preferensi, dan fakta penting ke Knowledge vault sebagai catatan singkat dengan atribusi sumber.
knowledge-claim-consolidation
394kMembantu agent Anda merapikan Knowledge vault dengan menggabungkan klaim duplikat, memindahkannya ke halaman subjek yang tepat, dan menonaktifkan klaim yang sudah usang.
knowledge-correct
394kMemungkinkan agent Anda memperbaiki atau menarik kembali klaim atau halaman Knowledge tertentu atas permintaan Anda, dengan menyimpan catatan perubahan.