acceptance-orchestrator
它能做什么
这个智能体负责管理编码任务的全过程。它确保工作经过实现、审查和部署,并依据既定标准进行验证,尽量减少人工干预。
适用场景
- ✓当一项编码任务需要从接收到最终验证全程自动运行时。
- ✓当你需要一套结构化的流程来完成实现、审查和部署时。
- ✓当你希望只有在需求通过验证后,才把工作视为完成时。
技能链接
https://github.com/sickn33/agentic-awesome-skills/blob/main/plugins/agentic-awesome-skills-claude/skills/acceptance-orchestrator/SKILL.md复制后粘贴给你的 AI(Claude、ChatGPT 或 Cursor),让它按照说明操作。
使用方法
最简单的方法:复制下面的消息,粘贴给你的 AI。它会读取这个技能并按说明操作。
可直接粘贴的消息
适用于 Claude Code、Codex 或 Cursor:在项目文件夹中运行,即可安装该技能。
下载 SKILL.md,放进智能体的技能文件夹。
可以这样问 AI
“从头到尾管理这个编码任务,确保满足验收标准,并附上证据完成验证。”
每周 5 个新技能,1 分钟读完。
工作原理
它的运作方式类似状态机,依次经过任务接收、执行、审查和部署等阶段。只有当证据表明验收标准已满足时,任务才算完成。
技术内容(原始 SKILL.md)
作者在 GitHub 上的英文原文。
Acceptance Orchestrator
Overview
Orchestrate coding work as a state machine that ends only when acceptance criteria are verified with evidence or the task is explicitly escalated.
Core rule: do not optimize for "code changed"; optimize for "DoD proven".
When to Use
- The task already has an issue or clear acceptance criteria and should run end-to-end with minimal human re-intervention.
- You need structured handoff across implementation, review, deployment, and final verification.
- You want explicit stop conditions and escalation instead of silent partial completion.
Required Sub-Skills
create-issue-gateclosed-loop-deliveryverification-before-completion
Deployment and PR monitoring are project-specific capabilities, not bundled sub-skills.
Use the repository's actual deployment and review procedures; the legacy names
deploy-dev, pr-watch, pr-review-autopilot, and git-ship are not available in AAS.
Inputs
Require these inputs:
- issue id or issue body
- issue status
- acceptance criteria (DoD)
- target environment (
devdefault)
Fixed defaults:
- max iteration rounds =
2 - PR review polling =
3m -> 6m -> 10m
State Machine
intakeissue-gatedexecutingreview-loopdeploy-verifyacceptedescalated
Workflow
Intake
- Read issue and extract task goal + DoD.
Issue gate
- Use
create-issue-gatelogic. - If issue is not
readyor execution gate is notallowed, stop immediately. - Do not implement anything while issue remains
draft.
- Use
Execute
- Hand off to
closed-loop-deliveryfor implementation and local verification.
- Hand off to
Review loop
- If PR feedback is relevant, batch polling windows as:
- wait
3m - then
6m - then
10m
- wait
- After the
10mround, stop waiting and process all visible comments together.
- If PR feedback is relevant, batch polling windows as:
Deploy and runtime verification
- If DoD depends on runtime behavior, verify the explicitly authorized environment.
- A
devlabel does not grant deployment permission; inspect effects and use the project's deployment gate before changing any shared environment. - Verify with real logs/API/Lambda behavior, not assumptions.
Completion gate
- Before any claim of completion, require
verification-before-completion. - No success claim without fresh evidence.
- Before any claim of completion, require
Stop Conditions
Move to accepted only when every acceptance criterion has matching evidence.
Move to escalated when any of these happen:
- DoD still fails after
2full rounds - missing secrets/permissions/external dependency blocks progress
- task needs production action or destructive operation approval
- review instructions conflict and cannot both be satisfied
Human Gates
Always stop for human confirmation on:
- prod/stage deploys beyond agreed scope
- destructive git/data operations
- billing or security posture changes
- missing user-provided acceptance criteria
Output Contract
When reporting status, always include:
Status: intake / executing / accepted / escalatedAcceptance Criteria: pass/fail checklistEvidence: commands, logs, API results, or runtime proofOpen Risks: anything still uncertainNeed Human Input: smallest next decision, if blocked
Do not report "done" unless status is accepted.
Example
User request:
Take this issue and its acceptance criteria through implementation, validation, review, and a final evidence-backed verdict.
Limitations
- Use this skill only when the task clearly matches the scope described above.
- Do not treat the output as a substitute for environment-specific validation, testing, or expert review.
- Stop and ask for clarification if required inputs, permissions, safety boundaries, or success criteria are missing.
常见问题
如果任务无法完成会怎样?
如果遇到阻碍,例如缺少权限或出现冲突,任务会上报给人工处理。
它如何验证任务是否成功?
它需要具体的证据,例如日志或测试结果,来确认每一条验收标准都已满足。
我需要提供很多信息吗?
需要。它需要任务 ID 或任务描述、验收标准,以及目标环境。
详情
作者的原始描述
Use when a coding task should be driven end-to-end from issue intake through implementation, review, deployment, and acceptance verification with minimal human re-intervention.
热度
- GitHub 星标
- 48k
- 排名
- #3630
- 许可证
- MIT
- 更新时间
- 2026/10/15
评论
- …
同一仓库的更多技能
00-andruia-consultant
48k帮你的智能体启动或改进 AI 项目。它可以分析代码、推荐工具,并用西班牙语制定行动计划。
007
48k让你的智能体执行安全审计和威胁建模。它有助于保护项目免受攻击和漏洞的威胁。
10-andruia-skill-smith
48k帮你的智能体创建或改进 AI 工具。它可以定义工具的工作方式、编写文档,并验证其结构。
20-andruia-niche-intelligence
48k让你的智能体创建某个特定行业的摘要。它有助于借助可靠的信息来源,了解项目的背景、规则、使用模式和风险。