跳到正文
Skillpedia
社交媒体29k · #9650

launch-strategy

它能做什么

这项技能规划产品或功能如何向公众推出。适合希望通过几周时间积累势头、而不是只靠一天的创始人和产品团队。

适用场景

  • ✓当你正在规划产品或功能上线的时候。
  • ✓当你准备 Product Hunt 发布、测试版或候补名单的时候。
  • ✓当你想检查团队是否已经准备好上线的时候。

技能链接

https://github.com/alirezarezvani/claude-skills/blob/main/marketing-skill/skills/launch-strategy/SKILL.md

复制后粘贴给你的 AI(Claude、ChatGPT 或 Cursor),让它按照说明操作。

使用方法

最简单的方法:复制下面的消息,粘贴给你的 AI。它会读取这个技能并按说明操作。

可直接粘贴的消息

请用这个技能帮我:https://github.com/alirezarezvani/claude-skills/blob/main/marketing-skill/skills/launch-strategy/SKILL.md 阅读该链接中的 SKILL.md 文件,并在我的任务中按照它的说明来做。
想让你的 AI 自己找到这样的技能吗?安装免费的 Skillpedia MCP:只需一行,每次任务前它都会在 15,000+ 个技能中搜索。1 分钟完成安装 →

可以这样问 AI

“请帮我规划新排程功能的上线方案,包括候补名单和 Product Hunt 发布日。”

每周 5 个新技能,1 分钟读完。

工作原理

它会把上线行动分配到自有、租用和借用的渠道上,将计划分为上线前、上线当天和上线后三个阶段,并为就绪度打分。

技术内容(原始 SKILL.md)

作者在 GitHub 上的英文原文。

Launch Strategy

You are an expert in SaaS product launches and feature announcements. Your goal is to help users plan launches that build momentum, capture attention, and convert interest into users.

Before Starting

Check for product marketing context first: If .claude/product-marketing-context.md exists, read it before asking questions. Use that context and only ask for information not already covered or specific to this task.


Core Philosophy

A launch is a momentum system, not a day. Two frameworks drive everything (full treatment in references/launch-frameworks-and-checklists.md):

ORB channel model — map every launch action to one of three channel types:

  • Owned — email list, blog, in-app. You control reach; activate first.
  • Rented — social platforms, communities. Algorithmic reach; you play by their rules.
  • Borrowed — partner audiences, newsletters, podcasts, Product Hunt. Other people's reach; requires relationship work weeks before launch day.

A plan that covers only one channel type is incomplete — the quality bar is all three.

Phase model — sequence the launch instead of betting on one day:

  1. Pre-launch (2-6 weeks out): waitlist/early access, borrowed-channel outreach, asset production
  2. Launch day: time-boxed checklist, all channels firing, founder availability for engagement
  3. Post-launch (30 days): momentum content — comparison pages, case studies, roundup email, retargeting

Tools

Tool Invocation Output
Readiness scorer python3 scripts/launch_readiness_scorer.py --checklist launch.json (no arg = embedded demo; --export-template writes a blank checklist; --json for pipelines) 0-100 readiness score by category with the weakest categories called out

Gate the launch date on it: score the checklist when planning starts and again one week out — launching below a passing score in the "owned channels ready" or "assets ready" categories means slipping the date, not hoping.

Task-Specific Questions

  1. What are you launching? (New product, major feature, minor update)
  2. What's your current audience size and engagement?
  3. What owned channels do you have? (Email list size, blog traffic, community)
  4. What's your timeline for launch?
  5. Have you launched before? What worked/didn't work?
  6. Are you considering Product Hunt? What's your preparation status?

Proactive Triggers

Proactively offer launch planning when:

  1. Feature ship date mentioned — When an engineering delivery date is discussed, immediately ask about the launch plan; shipping without a marketing plan is a missed opportunity.
  2. Waitlist or early access mentioned — Offer to design the full phased launch funnel from alpha through full GA, not just the landing page.
  3. Product Hunt consideration — Any mention of Product Hunt should trigger the full PH strategy section including pre-launch relationship building timeline.
  4. Post-launch silence — If a user launched recently but hasn't followed up with momentum content, proactively suggest the post-launch marketing actions (comparison pages, roundup email, interactive demo).
  5. Pricing change planned — Pricing updates are a launch opportunity; offer to build an announcement campaign treating it as a product update.

Output Artifacts

Artifact Format Description
Launch Plan Markdown doc Phase-by-phase plan with owners, dates, channels, and success metrics
ORB Channel Map Table Owned/Rented/Borrowed channel strategy with tactics per channel
Launch Day Checklist Checklist Complete day-of execution checklist with time-boxed actions
Product Hunt Brief Markdown doc Listing copy, asset specs, pre-launch timeline, engagement playbook
Post-Launch Momentum Plan Bulleted list 30-day post-launch actions to sustain and compound the launch

Communication

Launch plans should be concrete, time-bound, and channel-specific — no vague "post on social media" recommendations. Every output should specify who does what and when. Reference marketing-context to ensure the launch narrative matches ICP language and positioning before drafting any copy. Quality bar: a launch plan is only complete when it covers all three ORB channel types and includes both launch-day and post-launch actions.


Related Skills

  • email-sequence — USE for building the launch announcement and post-launch onboa
常见问题

什么是自有、租用和借用的渠道?

自有渠道是你的邮件列表和博客,租用渠道是社交平台,借用渠道是合作伙伴的受众和电子报。

上线计划应该持续多久?

它会规划上线日前两到六周的准备工作,以及上线后 30 天的跟进。

它包括候补名单吗?

包括,候补名单和抢先体验是上线前工作的一部分。

详情

作者的原始描述

Use when planning a product or feature launch, Product Hunt day, beta or waitlist, before writing the plan. Scores readiness with launch_readiness_scorer.py and phases the launch by channel.

repo: alirezarezvani/claude-skills

热度

GitHub 星标
29k
排名
#9650
许可证
MIT
更新时间
2026/11/2

这个技能有用吗?

0

登录 后即可投票。

评论

  • …

同一仓库的更多技能

相似技能