linkedin-strategy
它能做什么
这项技能在你发帖之前规划 LinkedIn 的存在感。它涵盖你要对谁说话、说什么内容,以及你能坚持多久发一次。适合希望有稳定计划、而不是随意发帖的专业人士。
适用场景
- ✓当你需要一份 LinkedIn 计划,而不是一条单独帖子的时候。
- ✓当你的 LinkedIn 帖子感觉彼此无关,想要明确的内容支柱的时候。
- ✓当你在决定要不要开始写 LinkedIn 通讯的时候。
技能链接
https://github.com/alirezarezvani/claude-skills/blob/main/marketing/linkedin/skills/linkedin-strategy/SKILL.md复制后粘贴给你的 AI(Claude、ChatGPT 或 Cursor),让它按照说明操作。
使用方法
最简单的方法:复制下面的消息,粘贴给你的 AI。它会读取这个技能并按说明操作。
可直接粘贴的消息
适用于 Claude Code、Codex 或 Cursor:在项目文件夹中运行,即可安装该技能。
下载 SKILL.md,放进智能体的技能文件夹。
可以这样问 AI
“请帮我为一位职业教练制定 LinkedIn 计划,包括内容支柱和切合实际的发帖时间表。”
每周 5 个新技能,1 分钟读完。
工作原理
它会引导你回答五个问题来形成定位简报,验证简报,设定两到四个内容支柱,并规划一个符合你每周可用时间的节奏。
技术内容(原始 SKILL.md)
作者在 GitHub 上的英文原文。
LinkedIn Strategy — brief, cadence, newsletter
Three decisions, in this order. Out of order is why most LinkedIn efforts produce a feed of unrelated observations and stop in week five.
Workflow
1. The brief — an editorial constitution, not a wish. Walk the five questions one at a time, each with a recommended answer, then validate:
python3 scripts/positioning_brief.py --input brief.json --output human
It refuses on the two things that make everything downstream impossible: an objective that
is not one of the six real ones (career-change, consulting, thought-leadership,
hiring, fundraising, community), and an audience too broad to exclude anyone. It also
refuses fewer than two exclusions — a positioning that excludes nothing is availability.
Pillars: two to four, shares summing to 100, at least one backed by proof that already exists, at least one at 10-20% as the experimental slot. Every pillar needs a "why you"; if anyone could post it, cut it.
The script emits observable 90-day criteria. Follower count is deliberately absent — it moves for reasons unrelated to whether the objective is being met.
2. The cadence — priced against a bad week.
python3 scripts/cadence_planner.py --minutes 240 --stage starting --target-posts 3 --output human
Exit 0 fits / 2 below the 90-minute floor / 3 over budget with the overage named. Every activity is priced in minutes including the reply window, which is part of the post and not an extra. Allocation shifts with stage: from a standing start 60% of the budget belongs in other people's comment sections, because a post published to nobody reaches nobody.
Below 90 minutes a week it refuses to plan a posting schedule and returns a comment-only week: a cadence abandoned in week five is worse than one never started, because the abandonment is visible on the profile. Every plan ships with a minimum viable week.
3. The newsletter — only if the promise can be paid.
python3 scripts/newsletter_planner.py --followers 1800 --cadence biweekly \
--minutes-per-month 420 --pillar "..." --output human
Refuses below LinkedIn's published 150-follower evaluation floor, and refuses a cadence whose six-month cost exceeds the budget. Emits a 12-issue arc rotating issue types across pillars, and a stop rule written before issue one.
Rules
- One objective. Two objectives serve neither; the audiences overlap less than they look.
- The exclusion list is the positioning. Refuse to skip it.
- Price the week from a bad week, not a good one.
- Consistency over volume. A skipped week is fine; a skipped month resets you.
- Review the brief quarterly, not weekly. A brief revised monthly is a mood.
Scripts
| Script | Role |
|---|---|
scripts/positioning_brief.py |
Validates objective, audience, 2-4 proof-backed pillars, and the exclusion list; emits observable 90-day criteria. |
scripts/cadence_planner.py |
Prices the week in minutes, allocates by stage, refuses over-budget targets, emits the minimum viable week. |
scripts/newsletter_planner.py |
Eligibility + six-month sustainability gate, 12-issue arc across pillars, stop rule. |
References and assets
references/objective_to_pillars.md— the six objectives and the pillar arithmetic (7 sources)references/cadence_and_consistency.md— what a post really costs and why the floor exists (7 sources)references/newsletter_playbook.md— eligibility, cadence as a promise, the stop rule (7 sources)assets/positioning_brief_template.md— fillable briefassets/example_brief.json— a passing brief, for the validator
Distinct from
linkedin-content— drafts and lints individual posts. This decides what they are about and how many there are. Posts without pillars are noise; offer this first, never chain silently.linkedin-analytics— tells you what happened. This decides what to do next.marketing-skill/content-strategy— company-level content marketing. This is one person's own presence.
Version: 1.0.0
常见问题
为什么计划需要排除项?
一个什么都不排除的定位太宽泛,因此简报要求至少有两项排除内容。
如何衡量成功?
计划采用可以观察到的 90 天标准,而不是粉丝数量。
节奏能配合繁忙的日程吗?
可以,节奏规划工具会检查发帖计划是否符合你每周的可用时间。
详情
作者的原始描述
Use when someone needs a LinkedIn plan rather than a post: content pillars, positioning, a sustainable cadence or a newsletter decision. Runs positioning_brief.py, cadence_planner.py and newsletter_planner.py.
热度
- GitHub 星标
- 29k
- 排名
- #9685
- 许可证
- MIT
- 更新时间
- 2026/11/2
评论
- …
同一仓库的更多技能
agent-launcher-orchestrator
29k帮你的智能体从一个清晰的目标出发,逐步规划、构建、测试并定时运行你自己账户中的 Claude 托管智能体。
grade-iterate
29k让你的智能体按评分标准为托管 AI 智能体的工作打分,并在固定的轮次内改进,因此它永远不会无限循环。
interview
29k让你的智能体就一个 AI 智能体的想法对你进行访谈,并在任何上线之前,把你的回答整理成一份简单的构建计划。
run-without-you
29k帮你的智能体设置托管 AI 智能体,使其按计划或在某个事件发生时运行,并在启动前检查定时设置。