ralplan
它能做什么
这个技能把需求转化为经过多个角色审阅的计划。适合希望在动手前拿到经过充分检查的计划的团队。
适用场景
- ✓当需求已经明确,并且你想在实施前拿到经过审阅的计划的时候。
- ✓当一项高风险改动需要比快速计划更严格的规划审阅的时候。
- ✓当你想拿到带有审阅记录证据的计划,交给执行环节的时候。
技能链接
https://github.com/Yeachan-Heo/oh-my-codex/blob/main/plugins/oh-my-codex/skills/ralplan/SKILL.md复制后粘贴给你的 AI(Claude、ChatGPT 或 Cursor),让它按照说明操作。
使用方法
最简单的方法:复制下面的消息,粘贴给你的 AI。它会读取这个技能并按说明操作。
可直接粘贴的消息
适用于 Claude Code、Codex 或 Cursor:在项目文件夹中运行,即可安装该技能。
下载 SKILL.md,放进智能体的技能文件夹。
可以这样问 AI
“请帮我制定一份经过审阅的数据库迁移计划,并记录审阅步骤。”
每周 5 个新技能,1 分钟读完。
工作原理
规划者先起草计划,架构师审阅,然后评审者按此顺序检查。每次审阅都会保存为证据,只有整个流程完成后,计划才会被标记为可以执行。
技术内容(原始 SKILL.md)
作者在 GitHub 上的英文原文。
Ralplan (Consensus Planning Alias)
Ralplan is the canonical consensus-planning stage used by Autopilot between $deep-interview and $ultragoal. It drives Planner, Architect, and Critic planning and records their review lifecycle with RALPLAN-DR structured deliberation (short mode by default, deliberate mode for high-risk work). Local lifecycle evidence is not host-issued security authority, but ordinary progression to Ultragoal must remain reachable after the execution-ready plan and sequential review evidence are durable; missing host provenance must not terminalize Ralplan or block cancel, clear, or recovery.
Usage
$ralplan "task description"
Standalone advisory planning is explicitly opt-in:
$ralplan --advisory "task description"
Advisory runs the same sequential Planner → Architect → Critic review lifecycle, binds the plan and both review artifacts to exact bytes and one tracker-backed iteration, then returns to the caller with active:false. It is a cooperative workflow pause, not a security fence or permission system. It never emits a PreToolUse allow/block decision, never completes the host consensus gate, never authorizes execution, and never suppresses unrelated host behavior. Terminal state must carry explicit false values for the consensus gate, host verification, and execution handoff rather than omitting them. A later concrete affirmative execution request may produce non-authoritative routing context, but it does not persist a permission, rewrite terminal evidence, or create an automatic handoff; quotations, code, examples, documentation, questions, modal requests, negations, and vague approval remain classifier negatives. approved+proven requires complete lifecycle digests plus post-write revalidation. Administrative abandonment is append-only, idempotent for prepared or committed journals, and records a separate byte-bound admin event without rewriting the original closeout journal. Real enforcement requires an explicit host-issued, host-verified receipt or capability on a non-user-mintable surface; local Advisory files, prompts, session/thread fields, tracker records, and HERDR observability cannot substitute for it. On Darwin, each Advisory evidence artifact is limited to 128 KiB by the pinned-directory reader; other supported platforms allow up to 8 MiB.
Flags
--interactive: Enables user prompts at key decision points (draft review in step 2 and final approval in step 6). Without this flag the workflow runs fully automated — Planner → Architect → Critic loop — and outputs the final plan without asking for confirmation.--deliberate: Forces deliberate mode for high-risk work. Adds pre-mortem (3 scenarios) and expanded test planning (unit/integration/e2e/observability). Without this flag, deliberate mode can still auto-enable when the request explicitly signals high risk (auth/security, migrations, destructive changes, production incidents, compliance/PII, public API breakage).--advisory: Standalone only. It cannot be combined with Autopilot, Pipeline, Team, Ralph, Ultragoal, execution flags, or unknown flags. Activation requires canonical session, root thread, and turn identity.
Ontology-heavy review
For requirements semantics, taxonomy, prompt/spec design, policy distinctions, or category-risk architecture, cite the architect role agent's read-only review as advisory evidence. Its findings can inform the plan or follow-up evidence when explicitly used, but $ralplan records Architect→Critic lifecycle evidence plus configured quality-gate results, and advisory review is never a durable execution authorization.
Usage with interactive mode
$ralplan --interactive "task description"
Behavior
GPT-5.6 Guidance Alignment
Use the shared workflow guidance pattern: outcome-first framing, concise visible updates for multi-step planning, local overrides for the active workflow branch, evidence-backed planning and validation expectations, explicit stop rules, right-sized implementation/PRD shape, and automatic continuation for safe reversible steps. Ask only for material, destructive, credentialed, external-production, or preference-dependent branches.
This skill runs its own consensus runtime; it does not delegate to a nonexistent Plan consensus mode:
omx ralplan run --task <arguments> [--session <id>]
The consensus workflow:
- Planner creates an adaptive plan (right-sized to task scope; do not default t
常见问题
咨询模式是什么?
它运行相同的审阅流程,但不授权执行,因此它的输出只是规划的参考。
它在更大的工作流程中处于什么位置?
通常位于澄清访谈和执行之间,是规划阶段。
计划会自动运行吗?
不会。计划会被交接出去,执行是另一个独立的步骤。
详情
作者的原始描述
Consensus planning stage for Planner -> Architect -> Critic handoff to $ultragoal
repo: Yeachan-Heo/oh-my-codex
热度
- GitHub 星标
- 34k
- 排名
- #8424
- 许可证
- MIT
- 更新时间
- 2026/11/2
评论
- …