scrum-master
它能做什么
这项技能分析迭代数据,以预测交付、检查迭代健康度,并跟进回顾会的行动事项。适合希望依据数据做决策的 Scrum Master 和敏捷团队负责人。
适用场景
- ✓当你想根据过去的迭代结果,预测工作何时能完成的时候。
- ✓当你想对当前迭代进行健康检查,或查看团队的阻碍的时候。
- ✓当你需要跟踪回顾会的行动事项是否已经完成的时候。
技能链接
https://github.com/alirezarezvani/claude-skills/blob/main/project-management/skills/scrum-master/SKILL.md复制后粘贴给你的 AI(Claude、ChatGPT 或 Cursor),让它按照说明操作。
使用方法
最简单的方法:复制下面的消息,粘贴给你的 AI。它会读取这个技能并按说明操作。
可直接粘贴的消息
适用于 Claude Code、Codex 或 Cursor:在项目文件夹中运行,即可安装该技能。
下载 SKILL.md,放进智能体的技能文件夹。
可以这样问 AI
“请根据我们最近六个迭代,预测待办清单何时能完成,并告诉我这个迭代的健康程度。”
每周 5 个新技能,1 分钟读完。
工作原理
智能体会对你的迭代历史运行分析脚本,包括趋势分析和蒙特卡洛模拟。然后它会解释结果并提出行动建议。它需要至少三个迭代的数据。
技术内容(原始 SKILL.md)
作者在 GitHub 上的英文原文。
Scrum Master Expert
Data-driven Scrum Master skill combining sprint analytics, probabilistic forecasting, and team development coaching. The unique value is in the three Python analysis scripts and their workflows — refer to references/ and assets/ for deeper framework detail.
Table of Contents
- Analysis Tools & Usage
- Input Requirements
- Sprint Execution Workflows
- Team Development Workflow
- Key Metrics & Targets
- Limitations
Analysis Tools & Usage
1. Velocity Analyzer (scripts/velocity_analyzer.py)
Runs rolling averages, linear-regression trend detection, and Monte Carlo simulation over sprint history.
# Text report
python velocity_analyzer.py sprint_data.json --format text
# JSON output for downstream processing
python velocity_analyzer.py sprint_data.json --format json > analysis.json
Outputs: velocity trend (improving/stable/declining), coefficient of variation, 6-sprint Monte Carlo forecast at 50 / 70 / 85 / 95% confidence intervals, anomaly flags with root-cause suggestions.
Validation: If fewer than 3 sprints are present in the input, stop and prompt the user: "Velocity analysis needs at least 3 sprints. Please provide additional sprint data." 6+ sprints are recommended for statistically significant Monte Carlo results.
2. Sprint Health Scorer (scripts/sprint_health_scorer.py)
Scores team health across 6 weighted dimensions, producing an overall 0–100 grade.
| Dimension | Weight | Target |
|---|---|---|
| Commitment Reliability | 25% | >85% sprint goals met |
| Scope Stability | 20% | <15% mid-sprint changes |
| Blocker Resolution | 15% | <3 days average |
| Ceremony Engagement | 15% | >90% participation |
| Story Completion Distribution | 15% | High ratio of fully done stories |
| Velocity Predictability | 10% | CV <20% |
python sprint_health_scorer.py sprint_data.json --format text
Outputs: overall health score + grade, per-dimension scores with recommendations, sprint-over-sprint trend, intervention priority matrix.
Validation: Requires 2+ sprints with ceremony and story-completion data. If data is missing, report which dimensions cannot be scored and ask the user to supply the gaps.
3. Retrospective Analyzer (scripts/retrospective_analyzer.py)
Tracks action-item completion, recurring themes, sentiment trends, and team maturity progression.
python retrospective_analyzer.py sprint_data.json --format text
Outputs: action-item completion rate by priority/owner, recurring-theme persistence scores, team maturity level (forming/storming/norming/performing), improvement-velocity trend.
Validation: Requires 3+ retrospectives with action-item tracking. With fewer, note the limitation and offer partial theme analysis only.
Input Requirements
All scripts accept JSON following the schema in assets/sample_sprint_data.json:
{
"team_info": { "name": "string", "size": "number", "scrum_master": "string" },
"sprints": [
{
"sprint_number": "number",
"planned_points": "number",
"completed_points": "number",
"stories": [...],
"blockers": [...],
"ceremonies": {...}
}
],
"retrospectives": [
{
"sprint_number": "number",
"went_well": ["string"],
"to_improve": ["string"],
"action_items": [...]
}
]
}
Jira and similar tools can export sprint data; map exported fields to this schema before running the scripts. See assets/sample_sprint_data.json for a complete 6-sprint example and assets/expected_output.json for corresponding expected results (velocity avg 20.2 pts, CV 12.7%, health score 78.3/100, action-item completion 46.7%).
Sprint Execution Workflows
Sprint Planning
- Run velocity analysis:
python velocity_analyzer.py sprint_data.json --format text - Use the 70% confidence interval as the recommended commitment ceiling for the sprint backlog.
- Review the health scorer's Commitment Reliability and Scope Stability scores to calibrate negotiation with the Product Owner.
- If Monte Carlo output shows high volatility (CV >20%), surface this to stakeholders with range estimates rather than single-point forecasts.
- Document capacity assumptions (leave, dependencies) for retrospective comparison.
Daily Standup
常见问题
需要多少迭代历史?
至少需要三个迭代来分析迭代速率;如果你提供的迭代更少,它会要求你提供更多。
预测结果如何呈现?
它会以多个置信水平显示预测区间,例如 50%、70%、85% 和 95%。
它也涵盖团队辅导吗?
涵盖,团队发展辅导与迭代分析一起包含在内。
详情
作者的原始描述
Use for sprint and team analytics: velocity forecasts, sprint health, retrospectives, burndown or blockers. Forecasts with velocity_analyzer.py (Monte Carlo), scores with sprint_health_scorer.py and tracks retro actions with retrospective_analyzer.py.
热度
- GitHub 星标
- 29k
- 排名
- #9722
- 许可证
- MIT
- 更新时间
- 2026/11/2
评论
- …
同一仓库的更多技能
agent-launcher-orchestrator
29k帮你的智能体从一个清晰的目标出发,逐步规划、构建、测试并定时运行你自己账户中的 Claude 托管智能体。
grade-iterate
29k让你的智能体按评分标准为托管 AI 智能体的工作打分,并在固定的轮次内改进,因此它永远不会无限循环。
interview
29k让你的智能体就一个 AI 智能体的想法对你进行访谈,并在任何上线之前,把你的回答整理成一份简单的构建计划。
run-without-you
29k帮你的智能体设置托管 AI 智能体,使其按计划或在某个事件发生时运行,并在启动前检查定时设置。