它能做什么
这个技能对当前冲刺的进展给出简短的只读更新。适合希望无需完整审阅、就能快速了解情况的团队成员。
适用场景
- ✓当团队成员询问冲刺进展如何,并想要快速答案的时候。
- ✓当制作人想发现当前冲刺中新出现的风险的时候。
- ✓当有人需要在每日站会前快速检查进度的时候。
技能链接
https://github.com/Donchitos/Claude-Code-Game-Studios/blob/main/.claude/skills/sprint-status/SKILL.md复制后粘贴给你的 AI(Claude、ChatGPT 或 Cursor),让它按照说明操作。
使用方法
最简单的方法:复制下面的消息,粘贴给你的 AI。它会读取这个技能并按说明操作。
可直接粘贴的消息
适用于 Claude Code、Codex 或 Cursor:在项目文件夹中运行,即可安装该技能。
下载 SKILL.md,放进智能体的技能文件夹。
可以这样问 AI
“冲刺进展怎么样?请给我一个快速概况。”
每周 5 个新技能,1 分钟读完。
工作原理
这个技能会找到当前的冲刺文件,扫描其故事中的状态标记,并编写一份简短的概况。它从不修改文件,最多只给出一条建议。
技术内容(原始 SKILL.md)
作者在 GitHub 上的英文原文。
!bash "${CLAUDE_SKILL_DIR}/../../hooks/yaml-helper.sh" resolve_config --keys story_granularity,workflow
Sprint Status
This is a fast situational awareness check, not a sprint review. It reads the
current sprint plan and story files, scans for status markers, and produces a
concise snapshot in under 30 lines. For detailed sprint management, use
/sprint-plan update or /milestone-review.
This skill is read-only. It never proposes changes, never asks to write files, and makes at most one concrete recommendation.
story_granularity — it sets the
grain of the burn-down read: feature-sized chunks at coarse (the default, via rigor: minimal), task-sized
at balanced (rigor: standard), AC-sized at fine.
1. Find the Sprint
Argument: $ARGUMENTS (blank = use current sprint)
- If an argument is given (e.g.,
/sprint-status 3), searchproduction/sprints/for a file matchingsprint-003.md,sprint-03.md,sprint-3.md, or similar (/sprint-planwrites three digits). Report which file was found. - If no argument is given, find the most recently modified file in
production/sprints/and treat it as the current sprint. - If
production/sprints/does not exist or is empty:- At
workflow: minimalthere are no sprints by design — the brief's build order is the plan and the story files carry it. Report progress through it instead, then stop:- The list below was printed by
.claude/scripts/story-status.shbefore you read this skill: one line per unfinished story, already in the route's order (IN_REVIEW,IN_PROGRESS, thenTODO— aReadyorNot Startedstory — in build order), thenBLOCKED,OTHER,NO_STATUSand theCOMPLETEcount:
- The list below was printed by
- At
!bash "${CLAUDE_SKILL_DIR}/../../scripts/story-status.sh"
2. Print, in under 15 lines: `Build order: [N] of [M] stories complete`
from the `COMPLETE` line (count only `Complete` and `Done` stories —
`In Review` is not complete), then **Next**: the story on the first
`IN_REVIEW`, `IN_PROGRESS` or `TODO` line. The list is already
current; do not run the script again, and do not re-rank the story files — an `In Review` story is closed before an
`In Progress` one continues: its work is written. Recommend
`/story-done [path]` for `IN_REVIEW`, `/dev-story [path]` for
`IN_PROGRESS` or `TODO`. Name any `BLOCKED` story with its blocker; it is
never Next.
3. Every story `Complete` (or `Done`) → "Build order done: [M] of [M]
stories complete." Offer three ways on: play the build; add the next
stories from the brief with `/create-stories`; or `/settings` to raise
`modes.rigor` if the game has outgrown a one-page brief.
4. `STORIES none` — no story files at all → "No stories yet. Run
`/create-stories` to turn the brief's build order into stories."
5. No `IN_REVIEW`, `IN_PROGRESS` or `TODO` line, yet the `COMPLETE` line
is short of the total — every unfinished story is `BLOCKED`, `OTHER`
(such as `Draft`) or `NO_STATUS`. There is **no Next**, and the build
order is **not** done: never say it is. Print the `Build order` line,
then name each `BLOCKED` story with its blocker — read from its story
file, usually a `BLOCKED:` note — and each other story with its status
as written. Recommend one step: what the first blocker needs, or else
finishing the first `Draft` or unstatused story and setting its Status
to `Ready`.
- At
standardorfull, report: "No sprint files found. Start a sprint with/sprint-plan new." Then stop.
Read the sprint file in full. Extract:
- Sprint number and goal
- Start date and end date
- All story or task entries with their priority (Must Have / Should Have / Nice to Have), owner, and estimate
2. Calculate Days Remaining
Using today's date and the sprint end date from the sprint file, calculate:
- Total sprint days (end minus start)
- Days elapsed
- Days remaining
- Percentage of time consumed
If the sprint file does not include explicit dates, note "Sprint dates not found — burndown assessment skipped."
3. Scan Story Status
First: check for production/sprint-status.yaml.
If it exists, read it directly — it is the authoritative source of truth.
Extract each story's status, and its priority, owner and blocker when set — they fill the status table's columns. N
常见问题
它会更改冲刺计划吗?
不会。这个技能是只读的,从不提出或写入更改。
我可以查看较早的冲刺吗?
可以。提供冲刺编号,技能就会查找对应的文件。
如果还没有冲刺怎么办?
在最轻的工作流程级别下,按设计本来就没有冲刺,因此技能会改为根据故事文件报告进展。
详情
作者的原始描述
Fast, concise sprint snapshot — burndown and emerging risks for situational awareness. 'How is the sprint going?'
热度
- GitHub 星标
- 33k
- 排名
- #8487
- 许可证
- MIT
- 更新时间
- 2026/10/18
评论
- …