uncertainty-and-units
它能做什么
这个工具帮你确保科学计算中的单位(如米、秒)和不确定度(一个数值有多可靠)处理正确。它可以进行单位换算、计算误差传递,并清晰地展示结果。
适用场景
- ✓在科学计算中进行单位换算时。
- ✓根据多次测量计算结果的不确定度时。
- ✓展示测量结果,让读者能理解其不确定度时。
技能链接
https://github.com/K-Dense-AI/scientific-agent-skills/blob/main/skills/uncertainty-and-units/SKILL.md复制后粘贴给你的 AI(Claude、ChatGPT 或 Cursor),让它按照说明操作。
使用方法
最简单的方法:复制下面的消息,粘贴给你的 AI。它会读取这个技能并按说明操作。
可直接粘贴的消息
适用于 Claude Code、Codex 或 Cursor:在项目文件夹中运行,即可安装该技能。
下载 SKILL.md,放进智能体的技能文件夹。
可以这样问 AI
“请把每小时 10 千米换算成米每秒,并告诉我它的不确定度。”
每周 5 个新技能,1 分钟读完。
工作原理
这个工具使用专门的库,在整个计算过程中追踪单位和不确定度。它确保单位得到正确处理,并按照既定的科学方法传递不确定度。
技术内容(原始 SKILL.md)
作者在 GitHub 上的英文原文。
Uncertainty and units
Scope
Use this skill whenever a calculation carries physical units or a reported number needs an uncertainty. Concretely:
- converting between units, including conversions that need a physical context (wavelength to photon energy, mass to amount of substance, energy to temperature);
- propagating uncertainty through a measurement model, with or without correlated inputs;
- building a GUM uncertainty budget from calibration certificates, specifications, and repeatability data;
- choosing a coverage factor and deciding whether
k = 2is defensible; - rounding and writing a result so a reader knows what the
±means; - extracting parameter uncertainties from a curve fit without discarding correlations;
- reviewing existing analysis code for silent unit and uncertainty defects;
- checking that a dimensionally consistent answer is also physically possible — the order of magnitude, the dimensionless group, and the regime it implies.
This skill covers the metrology and the two libraries that implement it. It does not
cover statistical inference, model selection, or study design — see statistical-analysis,
statistical-power, and experimental-design.
Current release and installation
Verified 2026-10-01:
- pint 0.26.1, released 2026-09-10; requires Python 3.12+.
- uncertainties 3.2.3, released 2025-04-21; requires Python 3.8+.
- NumPy 2.5.3 and SciPy 1.18.1; both require Python 3.12+.
scipy.constantsin SciPy 1.18.1 serves CODATA 2022. SciPy 1.11 and earlier served CODATA 2018; the switch to CODATA 2022 occurred in SciPy 1.15.
uv venv --python 3.13
source .venv/bin/activate
uv pip install "pint==0.26.1" "uncertainties==3.2.3" "numpy==2.5.3" "scipy==1.18.1"
pint-pandas and pint-xarray add unit-aware columns and arrays and are separate
installs.
Non-negotiable workflow
- Attach units at input and strip them only at output. Convert at function
boundaries with
ureg.wrapsorm_as("unit"), never mid-calculation. - Write the measurement model explicitly before computing anything, including corrections whose estimated value is zero. A correction left out of the model leaves its uncertainty out of the budget.
- Give every input four things: an estimate, a standard uncertainty, the distribution the uncertainty came from, and its degrees of freedom.
- Convert Type B statements with the right divisor. A certificate's expanded
uncertainty divides by its stated
k; rectangular limits divide bysqrt(3). - Identify correlations before combining. A shared calibration, instrument correction, or fit can induce correlation; quantify shared components instead of assuming every pair is correlated.
- Compute sensitivity coefficients, and read the budget from
c_i * u(x_i)rather than from the raw uncertainties. - Check the linearization. Compare propagated distributions with the GUM interval when in doubt. Establish Monte Carlo numerical stability before a JCGM 101 clause 8 claim; neither method validates the measurement model or the assigned input PDFs.
- Justify coverage. A Student-t factor from effective degrees of freedom is an approximation requiring suitable distributional assumptions.
- Round the uncertainty first, then the value to the same decimal place.
- State what the
±is — standard or expanded, withk, the coverage probability, and the method. - Sanity-check the magnitude before reporting. A dimensionally consistent result can still be impossible. Compare it against a known scale or a dimensionless group, and confirm every assumption you relied on still holds in that regime.
The failures this skill exists to prevent
Each of the following runs without error and produces a plausible number.
A unit stripped at an unknown scale
length = (12.7 * ureg.mm).magnitude # 12.7 -- of what?
length = (12.7 * ureg.mm).m_as("m") # 0.0127 metres, stated
.magnitude returns whatever the quantity happened to be carrying. Name the unit at the
point of extraction, every time.
Offset temperature arithmetic
Q(20, "degC") + Q(5, "degC") # OffsetUnitCalculusError -- correctly refused
Q(20, "degC") + Q(5, "delta_degC") # 25 degree_Celsius
Q(25, "degC") - Q(20, "degC") # 5 delta_degree_Celsius
…
常见问题
什么是物理单位?
它们是用于度量长度(米)、时间(秒)或质量(千克)等物理量的标准。
什么是测量不确定度?
它表示测量值周围的一个范围,真实值有一定概率落在这个范围之内。
为什么追踪单位和不确定度很重要?
这样可以确保科学结果的准确性、可比性和可靠性,避免复杂计算中的常见错误。
详情
作者的原始描述
Tracks physical units and propagates measurement uncertainty in scientific calculations using pint and uncertainties. Use for unit conversion and dimensional checking, GUM uncertainty budgets, Type A and Type B evaluation, coverage factors and expanded uncertainty, Monte Carlo propagation, significant-figure and plus-minus reporting, error propagation through curve fits, CODATA constants, auditing
热度
- GitHub 星标
- 51k
- 排名
- #3589
- 许可证
- MIT
- 更新时间
- 2026/10/15
评论
- …