Skip to content
Skillpedia
Deploy & cloud (DevOps)40k · #5116

devops-rollout-plan

Creates detailed plans for deploying infrastructure and application changes, including checks and rollback.

What it does

This agent creates a detailed plan for releasing new software versions or infrastructure updates. It includes pre-launch checks, deployment steps, how to verify if everything is working, what to do if something goes wrong, and how to communicate the changes.

When to use it

  • ✓When releasing a new version of an application.
  • ✓When making significant changes to server infrastructure.
  • ✓When updating configurations that affect many users.

Example of what to ask your AI

“Generate a rollout plan for updating our e-commerce application to version 3.0, deploying to Kubernetes servers in production. Acceptable downtime is 30 minutes between 2 AM and 4 AM on Saturday.”

Want more? Open the sections below.

How to use

The easiest way: copy the message below and paste it into Claude, ChatGPT, Cursor or any AI. It reads the skill and follows the instructions.

Skill link

https://github.com/github/awesome-copilot/blob/main/skills/devops-rollout-plan/SKILL.md

Ready-to-paste message

Use this skill to help me: https://github.com/github/awesome-copilot/blob/main/skills/devops-rollout-plan/SKILL.md Read the SKILL.md file at that link and follow its instructions for my task.
How it works

You tell me what's changing, where, and what the constraints are. I use that information to assemble a step-by-step plan with checks, rollback procedures, and communication plans.

Installation

Easiest way: copy the skill link and paste it into Claude, ChatGPT or Cursor asking it to follow the instructions.

In the terminal (Claude Code, Codex, Cursor), in your project folder:

npx skills add github/awesome-copilot --skill devops-rollout-plan

Or download just the file:

curl -L https://raw.githubusercontent.com/github/awesome-copilot/main/skills/devops-rollout-plan/SKILL.md -o SKILL.md
Technical content (original SKILL.md)

Original text by the author, straight from GitHub.

DevOps Rollout Plan Generator

Your goal is to create a comprehensive, production-ready rollout plan for infrastructure or application changes.

Input Requirements

Gather these details before generating the plan:

Change Description

  • What's changing (infrastructure, application, configuration)
  • Version or state transition (from/to)
  • Problem solved or feature added

Environment Details

  • Target environment (dev, staging, production, all)
  • Infrastructure type (Kubernetes, VMs, serverless, containers)
  • Affected services and dependencies
  • Current capacity and scale

Constraints & Requirements

  • Acceptable downtime window
  • Change window restrictions
  • Approval requirements
  • Regulatory or compliance considerations

Risk Assessment

  • Blast radius of change
  • Data migrations or schema changes
  • Rollback complexity and safety
  • Known risks

Output Format

Generate a structured rollout plan with these sections:

1. Executive Summary

  • What, why, when, duration
  • Risk level and rollback time
  • Affected systems and user impact
  • Expected downtime

2. Prerequisites & Approvals

  • Required approvals (technical lead, security, compliance, business)
  • Required resources (capacity, backups, monitoring, rollback automation)
  • Pre-deployment backups

3. Preflight Checks

  • Infrastructure health validation
  • Application health baseline
  • Dependency availability
  • Monitoring baseline metrics
  • Go/no-go decision checklist

4. Step-by-Step Rollout Procedure

Phases: Pre-deployment, deployment, progressive verification

  • Specific commands for each step
  • Validation after each step
  • Duration estimates

5. Verification Signals

Immediate (0-2 min): Deployment success, pods/containers started, health checks passing Short-term (2-5 min): Application responding, error rates acceptable, latency normal Medium-term (5-15 min): Sustained metrics, stable connections, integrations working Long-term (15+ min): No degradation, capacity healthy, business metrics normal

6. Rollback Procedure

Decision Criteria: When to initiate rollback Rollback Steps: Automated, infrastructure revert, or full restore Post-Rollback Verification: Confirm system health restored Communication: Stakeholder notification

7. Communication Plan

  • Pre-deployment (T-24h): Schedule and impact notice
  • Deployment start: Commencement notice
  • Progress updates: Status every X minutes
  • Completion: Success confirmation
  • Rollback (if needed): Issue notification

Stakeholder Matrix: Who to notify, when, via what method, with what content

8. Post-Deployment Tasks

  • Immediate (1h): Verify criteria met, review logs
  • Short-term (24h): Monitor metrics, review errors
  • Medium-term (1 week): Post-deployment review, lessons learned

9. Contingency Plans

Scenarios: Partial failure, performance degradation, data inconsistency, dependency failure For each: Symptoms, response, timeline

10. Contact Information

  • Primary and secondary on-call
  • Escalation path
  • Emergency contacts (infrastructure, security, database, networking)

Plan Customization

Adapt based on:

  • Infrastructure Type: Kubernetes, VMs, serverless, databases
  • Risk Level: Low (simplified), medium (standard), high (additional gates)
  • Change Type: Code deployment, infrastructure, configuration, data migration
  • Environment: Production (full plan), staging (simplified), development (minimal)

Remember

  • Always have a tested rollback plan
  • Communicate early and often
  • Monitor metrics, not just logs
  • Document everything
  • Learn from each deployment
  • Never deploy on Friday afternoon (unless critical)
  • Never skip verification steps
  • Never assume "it should work"
FAQ

What are 'verification signals'?

These are metrics and indicators that show if the new release is working correctly after deployment, such as error rates and application response times.

What is a 'rollback plan'?

It's a set of instructions to revert the change and go back to the previous state if something goes very wrong during or after the release.

Do I need to know technical details to use this?

No, you just need to describe the change, the environment, and the constraints. The agent will handle the technical details of the plan.

Details

Original description by the author

Generate comprehensive rollout plans with preflight checks, step-by-step deployment, verification signals, rollback procedures, and communication plans for infrastructure and application changes

repo: github/awesome-copilot

Popularity

GitHub stars
40k
Ranking position
#5116
License
MIT
Updated
10/15/2026

Is this skill useful?

0

Sign in to vote.

Comments

  • …

More skills from this repository

Similar skills