change-management

Implements change management processes, including reviews and rollback procedures.

What it does

This tool helps organize and plan computer system changes safely. It ensures changes are approved, tested, and have a plan to undo them if something goes wrong.

When to use it

  • ✓When planning to install a new software version.
  • ✓When needing to alter network infrastructure.
  • ✓To fix an urgent issue in a live system.

Example of what to ask your AI

“I want to plan the update of our database system to version 5.0. What are the steps and who needs to approve it?”

Want more? Open the sections below.

How to use

The easiest way: copy the message below and paste it into Claude, ChatGPT, Cursor or any AI. It reads the skill and follows the instructions.

Skill link

https://github.com/sickn33/agentic-awesome-skills/blob/main/plugins/agentic-awesome-skills-claude/skills/change-management/SKILL.md

Ready-to-paste message

Use this skill to help me: https://github.com/sickn33/agentic-awesome-skills/blob/main/plugins/agentic-awesome-skills-claude/skills/change-management/SKILL.md Read the SKILL.md file at that link and follow its instructions for my task.
How it works

You describe the change you want to make, the associated risks, and how it will be implemented. The tool then guides you through the approval and planning stages.

Installation

Easiest way: copy the skill link and paste it into Claude, ChatGPT or Cursor asking it to follow the instructions.

In the terminal (Claude Code, Codex, Cursor), in your project folder:

npx skills add sickn33/agentic-awesome-skills --skill change-management

Or download just the file:

curl -L https://raw.githubusercontent.com/sickn33/agentic-awesome-skills/main/plugins/agentic-awesome-skills-claude/skills/change-management/SKILL.md -o SKILL.md
Technical content (original SKILL.md)

Original text by the author, straight from GitHub.

Change Management

Implement structured change management processes covering change classification, CAB workflows, emergency change procedures, and automation for compliance with SOC 2, ITIL, and regulatory frameworks.

Change Classification

change_types:
  standard:
    risk: Low
    approval: Pre-approved (no per-change approval needed)
    lead_time: None (within maintenance window)
    examples:
      - Routine patching within tested patch sets
      - Certificate rotation with established procedure
      - Scaling operations (adding/removing instances within limits)
      - Pre-approved configuration changes
      - Log rotation and archival
    requirements:
      - Change must match an approved Standard Change template
      - Automated testing must pass
      - Documented rollback procedure exists
      - Within defined maintenance window

  normal_low:
    risk: Low
    approval: Peer review (1 approver)
    lead_time: 2 business days
    examples:
      - Non-critical configuration changes
      - Feature flag toggles
      - Documentation updates to production systems
      - Adding monitoring dashboards or alerts

  normal_medium:
    risk: Medium
    approval: Team lead + peer review (2 approvers)
    lead_time: 5 business days
    examples:
      - Application deployments with new features
      - Database schema changes (non-breaking)
      - Network rule modifications
      - Integration endpoint changes
      - Dependency version upgrades

  normal_high:
    risk: High
    approval: CAB review required
    lead_time: 10 business days
    examples:
      - Infrastructure migrations
      - Breaking database schema changes
      - Major version upgrades (OS, runtime, database engine)
      - Changes to authentication or authorization systems
      - Multi-service coordinated deployments
      - Changes affecting data processing or compliance controls

  emergency:
    risk: Variable
    approval: Emergency CAB (minimum 2 approvers from on-call)
    lead_time: None (immediate implementation)
    examples:
      - Security vulnerability remediation (active exploitation)
      - Production outage resolution
      - Data integrity emergency fixes
      - Regulatory compliance deadline fixes
    requirements:
      - Retroactive full documentation within 48 hours
      - Post-implementation review required
      - CAB retroactive review at next meeting

Change Request Template

change_request:
  metadata:
    id: "CR-YYYY-NNNN"
    title: ""
    requestor: ""
    date_submitted: ""
    target_date: ""
    change_type: ""  # standard | normal_low | normal_medium | normal_high | emergency

  description:
    summary: "Brief description of the change"
    detailed_description: "Full technical details of what will change"
    business_justification: "Why this change is needed"
    affected_systems: []
    affected_services: []
    affected_users: "Description of user impact"

  risk_assessment:
    risk_level: ""  # low | medium | high
    impact_if_failed: "What happens if the change fails"
    likelihood_of_failure: ""  # low | medium | high
    risk_mitigation: "Steps to reduce risk"
    dependencies: "Other systems or changes this depends on"

  implementation:
    change_window:
      start: ""
      end: ""
      maintenance_window: true
    implementation_steps:
      - step: "Step 1 description"
        responsible: "Person/team"
        estimated_duration: "X minutes"
      - step: "Step 2 description"
        responsible: "Person/team"
        estimated_duration: "X minutes"

  testing:
    pre_change_testing:
      - "Unit tests pass"
      - "Integration tests pass"
      - "Staging deployment verified"
    post_change_verification:
      - "Health check endpoints responding"
      - "Key transactions processing successfully"
      - "No error rate increase in monitoring"
      - "Performance metrics within baseline"

  rollback:
    rollback_plan: "Detailed steps to revert the change"
    rollback_trigger: "Conditions that trigger rollback"
    rollback_estimated_time: "X minutes"
    rollback_steps:
      - "Step 1: Revert deployment to previous version"
      - "Step 2: Verify rollback successful"
      - "Step 3: Notify stakeholders"
    data_rollback: "Describe any data migration rollback needed"

  communication:
    stakeholders_notified: []
    notification_sent_date: ""
    status_page_update: true
    customer_notification_required: false

  approvals:

…
FAQ

What is a 'Change Window'?

It's a specific, scheduled time period when changes can be made to systems, usually during off-peak hours to minimize impact.

What is a 'Rollback Plan'?

It's a detailed plan explaining how to revert a change if it causes problems or doesn't work as expected.

What is the 'CAB'?

CAB stands for 'Change Advisory Board'. It's a group of people who review and approve important changes to ensure they are safe and well-planned.

Details

Original description by the author

Implement change management processes. Configure CAB reviews, change windows, and rollback procedures. Use when managing production changes.

repo: sickn33/agentic-awesome-skills

Popularity

GitHub stars
48k
Ranking position
#2507
License
MIT
Updated
10/15/2026

Is this skill useful?

0

Sign in to vote.

Comments

  • …

More skills from this repository

Similar skills