energy-procurement
Lets your agent manage energy procurement. It optimizes electricity and gas costs for businesses.
What it does
This tool helps manage how your company buys electricity and gas. It analyzes costs, optimizes prices, and aids in making decisions about energy contracts.
When to use it
- ✓When trying to reduce your company's electricity or gas costs.
- ✓When evaluating proposals from energy suppliers.
- ✓When planning long-term energy spending.
Example of what to ask your AI
“How can I reduce my factory's energy costs for next year?”
Want more? Open the sections below.
How to use
The easiest way: copy the message below and paste it into Claude, ChatGPT, Cursor or any AI. It reads the skill and follows the instructions.
Skill link
Ready-to-paste message
How it works
The tool analyzes your electricity bill, compares different supplier plans, and identifies savings opportunities by considering factors like consumption and peak hours.
Installation
Easiest way: copy the skill link and paste it into Claude, ChatGPT or Cursor asking it to follow the instructions.
In the terminal (Claude Code, Codex, Cursor), in your project folder:
npx skills add sickn33/agentic-awesome-skills --skill energy-procurementOr download just the file:
curl -L https://raw.githubusercontent.com/sickn33/agentic-awesome-skills/main/plugins/agentic-awesome-skills-claude/skills/energy-procurement/SKILL.md -o SKILL.mdTechnical content (original SKILL.md)
Original text by the author, straight from GitHub.
When to Use
Use this skill when managing energy procurement tasks, such as optimizing electricity or gas tariffs, evaluating Power Purchase Agreements (PPAs), or developing long-term energy cost management strategies for commercial or industrial facilities.
Energy Procurement
Role and Context
You are a senior energy procurement manager at a large commercial and industrial (C&I) consumer with multiple facilities across regulated and deregulated electricity markets. You manage an annual energy spend of $15M–$80M across 10–50+ sites — manufacturing plants, distribution centers, corporate offices, and cold storage. You own the full procurement lifecycle: tariff analysis, supplier RFPs, contract negotiation, demand charge management, renewable energy sourcing, budget forecasting, and sustainability reporting. You sit between operations (who control load), finance (who own the budget), sustainability (who set emissions targets), and executive leadership (who approve long-term commitments like PPAs). Your systems include utility bill management platforms (Urjanet, EnergyCAP), interval data analytics (meter-level 15-minute kWh/kW), energy market data providers (ICE, CME, Platts), and procurement platforms (energy brokers, aggregators, direct ISO market access). You balance cost reduction against budget certainty, sustainability targets, and operational flexibility — because a procurement strategy that saves 8% but exposes the company to a $2M budget variance in a polar vortex year is not a good strategy.
Core Knowledge
Pricing Structures and Utility Bill Anatomy
Every commercial electricity bill has components that must be understood independently — bundling them into a single "rate" obscures where real optimization opportunities exist:
- Energy charges: The per-kWh cost for electricity consumed. Can be flat rate (same price all hours), time-of-use/TOU (different prices for on-peak, mid-peak, off-peak), or real-time pricing/RTP (hourly prices indexed to wholesale market). For large C&I customers, energy charges typically represent 40–55% of the total bill. In deregulated markets, this is the component you can competitively procure.
- Demand charges: Billed on peak kW drawn during a billing period, measured in 15-minute intervals. The utility takes the highest single 15-minute average kW reading in the month and multiplies by the demand rate ($8–$25/kW depending on utility and rate class). Demand charges represent 20–40% of the bill for manufacturing facilities with variable loads. One bad 15-minute interval — a compressor startup coinciding with HVAC peak — can add $5,000–$15,000 to a monthly bill.
- Capacity charges: In markets with capacity obligations (PJM, ISO-NE, NYISO), your share of the grid's capacity cost is allocated based on your peak load contribution (PLC) during the prior year's system peak hours (typically 1–5 hours in summer). PLC is measured at your meter during the system coincident peak. Reducing load during those few critical hours can cut capacity charges by 15–30% the following year. This is the single highest-ROI demand response opportunity for most C&I customers.
- Transmission and distribution (T&D): Regulated charges for moving power from generation to your meter. Transmission is typically based on your contribution to the regional transmission peak (similar to capacity). Distribution includes customer charges, demand-based delivery charges, and volumetric delivery charges. These are generally non-bypassable — even with on-site generation, you pay distribution charges for being connected to the grid.
- Riders and surcharges: Renewable energy standards compliance, nuclear decommissioning, utility transition charges, and regulatory mandated programs. These change through rate cases. A utility rate case filing can add $0.005–$0.015/kWh to your delivered cost — track open proceedings at your state PUC.
Procurement Strategies
The core decision in deregulated markets is how much price risk to retain versus transfer to suppliers:
- Fixed-price (full requirements): Supplier provides all electricity at a locked $/kWh for the contract term (12–36 months). Provides budget certainty. You pay a risk premium — typically 5–12% above the forward curve at contract signing — because the supplier is absorbing price, volume, and basis risk. Best for organizations where budget predictability outweighs cost minimization.
…
FAQ
What are 'demand charges'?
These are charges based on the maximum amount of power your company uses in a short period (usually 15 minutes). Reducing peak consumption can lower these costs.
What is a PPA (Power Purchase Agreement)?
It's a contract to purchase electricity, often from renewable sources, where the price and quantity are set for a long term.
What's the difference between regulated and deregulated markets?
In a regulated market, the price is set by the utility. In a deregulated market, your company can choose its supplier and negotiate prices.
Details
Original description by the author
Codified expertise for electricity and gas procurement, tariff optimisation, demand charge management, renewable PPA evaluation, and multi-facility energy cost management.
Popularity
- GitHub stars
- 48k
- Ranking position
- #2920
- License
- MIT
- Updated
- 10/15/2026
Comments
- …
More skills from this repository
00-andruia-consultant
Helps your agent start or improve AI projects. It analyzes code, suggests tools, and creates action plans in Spanish.
sickn33/agentic-awesome-skills
007
Lets your agent perform security audits and threat modeling. It's useful for protecting projects against attacks and vulnerabilities.
sickn33/agentic-awesome-skills
10-andruia-skill-smith
Helps your agent create or improve AI tools. It defines how tools work, writes documentation, and validates the structure.
sickn33/agentic-awesome-skills
20-andruia-niche-intelligence
Lets your agent create a summary about a specific industry. It's useful for understanding the context, rules, usage patterns, and risks of a project, using reliable sources.
sickn33/agentic-awesome-skills
Similar skills
data-throughput-accelerator
Makes your agent speed up the movement of large data volumes. It finds bottlenecks and ensures data is transferred quickly and correctly.
affaan-m/ECC
inventory-demand-planning
Helps your agent predict product demand in stores. It optimizes stock and plans when to run promotions to sell more.
affaan-m/ECC
market-research
Helps your agent conduct market research and competitive analysis. Provides summaries with source attribution.
affaan-m/ECC