Skip to content
Skillpedia
APIs & servers (backend)48k · #3728

odoo-manufacturing-advisor

Lets your agent set up the manufacturing area in Odoo. It manages Bills of Materials, Work Centers, and production planning.

What it does

This guide helps you set up and optimize the Odoo manufacturing system. It explains how to create material lists, configure workstations, and plan production to ensure you have the right materials at the right time.

When to use it

  • ✓When creating the parts list for a new product.
  • ✓When setting up production machines and steps.
  • ✓To plan production and know what to buy or make.

Example of what to ask your AI

“How do I set up a bill of materials for a new product?”

Want more? Open the sections below.

How to use

The easiest way: copy the message below and paste it into Claude, ChatGPT, Cursor or any AI. It reads the skill and follows the instructions.

Skill link

https://github.com/sickn33/agentic-awesome-skills/blob/main/plugins/agentic-awesome-skills-claude/skills/odoo-manufacturing-advisor/SKILL.md

Ready-to-paste message

Use this skill to help me: https://github.com/sickn33/agentic-awesome-skills/blob/main/plugins/agentic-awesome-skills-claude/skills/odoo-manufacturing-advisor/SKILL.md Read the SKILL.md file at that link and follow its instructions for my task.
How it works

You describe what you want to do, and the AI gives you step-by-step instructions for setting up material lists, production steps, and planning. It also helps you understand material alerts.

Installation

Easiest way: copy the skill link and paste it into Claude, ChatGPT or Cursor asking it to follow the instructions.

In the terminal (Claude Code, Codex, Cursor), in your project folder:

npx skills add sickn33/agentic-awesome-skills --skill odoo-manufacturing-advisor

Or download just the file:

curl -L https://raw.githubusercontent.com/sickn33/agentic-awesome-skills/main/plugins/agentic-awesome-skills-claude/skills/odoo-manufacturing-advisor/SKILL.md -o SKILL.md
Technical content (original SKILL.md)

Original text by the author, straight from GitHub.

Odoo Manufacturing Advisor

Overview

This skill helps you configure and optimize Odoo Manufacturing (MRP). It covers Bills of Materials (BoM), Work Centers, routing operations, production order lifecycle, and Material Requirements Planning (MRP) runs to ensure you never run short of materials.

When to Use This Skill

  • Creating or structuring Bills of Materials for finished goods.
  • Setting up Work Centers with capacity and efficiency settings.
  • Running an MRP to automatically generate purchase and production orders from demand.
  • Troubleshooting production order discrepancies or component availability issues.

How It Works

  1. Activate: Mention @odoo-manufacturing-advisor and describe your manufacturing scenario.
  2. Configure: Receive step-by-step instructions for BoM setup, routing, and MRP configuration.
  3. Plan: Get guidance on running MRP and interpreting procurement messages.

Examples

Example 1: Create a Bill of Materials

Menu: Manufacturing → Products → Bills of Materials → New

Product: Finished Widget v2
BoM Type: Manufacture This Product
Quantity: 1 (produce 1 unit per BoM)

Components Tab:
  - Raw Plastic Sheet  | Qty: 0.5  | Unit: kg
  - Steel Bolt M6      | Qty: 4    | Unit: Units
  - Rubber Gasket      | Qty: 1    | Unit: Units

Operations Tab (requires "Work Orders" enabled in MFG Settings):
  - Operation: Injection Molding | Work Center: Press A   | Duration: 30 min
  - Operation: Assembly          | Work Center: Line 1    | Duration: 15 min

BoM Types explained:

  • Manufacture This Product — standard production BoM, creates a Manufacturing Order
  • Kit — sold as a bundle; components are delivered separately (no MO created)
  • Subcontracting — components are sent to a subcontractor who returns the finished product

Example 2: Configure a Work Center

Menu: Manufacturing → Configuration → Work Centers → New

Work Center: CNC Machine 1
Working Hours: Standard 40h/week
Time Efficiency: 85%      (machine downtime factored in; 85% = 34 effective hrs/week)
Capacity: 2               (can run 2 production operations simultaneously)
OEE Target: 90%           (Overall Equipment Effectiveness KPI target)
Costs per Hour: $75.00    (used for manufacturing cost reporting)

Example 3: Run the MRP Scheduler

The MRP scheduler runs automatically via a daily cron job.
To trigger it manually:

Menu: Inventory → Operations → Replenishment → Run Scheduler
(or Manufacturing → Planning → Replenishment in some versions)

After running, review procurement exceptions:
Menu: Inventory → Operations → Replenishment

Message Types:
  "Replenish"   — Stock is below minimum; needs a PO or MO
  "Reschedule"  — An order's scheduled date conflicts with demand
  "Cancel"      — Demand no longer exists; the order can be cancelled

Best Practices

  • ✅ Do: Enable Work Orders in Manufacturing Settings to use routing and time-tracking per operation.
  • ✅ Do: Use BoM with variants (via product attributes) for products that come in multiple configurations (color, size, voltage) — avoids duplicate BoMs.
  • ✅ Do: Set Lead Times on components (vendor lead time + security lead time) so MRP schedules purchase orders in advance.
  • ✅ Do: Use Scrap Orders when discarding defective components during production — never adjust stock manually.
  • ❌ Don't: Manually create purchase orders for MRP-managed items — override MRP suggestions only when justified.
  • ❌ Don't: Confuse Kit BoM with Manufacture This Product — a Kit never creates a Manufacturing Order.

Limitations

  • This skill targets Odoo Manufacturing (mrp) module. Maintenance, PLM (Product Lifecycle Management), and Quality modules are separate Enterprise modules not covered here.
  • Subcontracting workflows (sending components to a third-party manufacturer) have additional receipt and valuation steps not fully detailed here.
  • Lot/serial number traceability in production (tracking which lot was consumed per MO) adds complexity; test with small batches before full rollout.
  • MRP calculations assume demand comes from Sale Orders and Reordering Rules — forecasts from external systems require custom integration.
FAQ

What is a Bill of Materials (BoM)?

It's the recipe for a product, listing all the parts and steps needed to make it.

What is a Work Center?

It's the location or machine where a production step takes place, with settings for time and capacity.

What is MRP Planning?

It's the system that automatically calculates what needs to be bought or made based on demand and current stock.

Details

Original description by the author

Expert guide for Odoo Manufacturing: Bills of Materials (BoM), Work Centers, routings, MRP planning, and production order workflows.

repo: sickn33/agentic-awesome-skills

Popularity

GitHub stars
48k
Ranking position
#3728
License
MIT
Updated
10/15/2026

Is this skill useful?

0

Sign in to vote.

Comments

  • …

More skills from this repository

Similar skills